Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania

Geraldine Kikwasi


Abstract

Delays and disruptions are among the challenges faced in the course of executing construction projects. Delays as well as disruptions are sources of potential risks that current studies are looking into ways to manage such as technical, social, economic, legal, financial, resource, construction and commercial. The purpose of this research is to assess causes and effects and disruptions in construction projects. This study is descriptive, designed to obtain views from clients, consulting firms, regulatory boards and construction firms in regard to causes and effects of delays in construction projects. Two sampling techniques were used to select respondents namely: purposive and random sampling. Literature review, questionnaires and interviews techniques were used to collect data for the study. Findings reveal that the main causes of delays and disruptions are: design changes, delays in payment to contractors, information delays, funding problems, poor project management, compensation issues and disagreement on the valuation of work done. On the other hand, time overrun, cost overrun, negative social impact, idling resources and disputes are the main effects of delays and disruptions. The study concludes that there still exist a number of causes of delays and disruptions and their effects put construction projects at great risk that have an effect on their performance. It is therefore recommended that adequate construction budget, timely issuing of information, finalization of design and project management skills should be the main focus of the parties in project procurement process.

Full Text

PDF

References

Aibinu, A.A., and Jagboro, G., O. 2002. The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, Vol. 20, pp. 593–9.

Aiyetan, O.A., Smallwood, J.J., and Shakantu, W. 2008. Influences on construction project delivery time performance. In the proceeding of Third Built Environment conference, Cape Town, South Africa

Al-Kharashi, A., and Skitmore, M. 2009. Causes of delays in Saudi Arabianpublic sector construction projects.Construction Management and Economics, 27(1). pp. 3-23. www.eprints.qut.edu.au Accessed 4/9/2012.

Baloi, D., Price, A.D.F. (2003). Modelling global risk factors affecting construction cost performance, International Journal of Project Management, 21, pp. 261- 269.

Chan, W. M., and Kumaraswamy, M.M.1997. A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of ProjectManagement.

Chileshe, N., and Berko, P. D. 2010. Causes of project cost overrun within Ghanian road construction sector.In the proceeding of ASOCSA 5th Built Environment Conference, Durban South Africa.

Chileshe, N., Haupt, T., and Fester, F. 2007. Assessing the readiness of building diplomates for the South African construction industry. Journal for Education in the Built Environment, 2 (2).

Cohen, M.W., and Palmer, G.R. 2004. Project risk identification and management, AACE International Transactions.

Haseeb, M., Xinhai-Lu, Aneesa Bibi, A., Maloof-ud-Dyian, Rabbani, W. 2011. Problems of projects and effects of delays in the construction industry of Pakistan. Australian Journal of Business and Management Research, 1 (5) pp 41-50. www.qsspace.qu.edu.qa/handle/10576/7921 Accessed 4/9/2012

Howick, S., Ackermann, Eden, F., and Terry Williams. 2009. Understanding the causes and consequences of disruption and delay in complex projects: How system dynamics can help. School of Management, Southampton, University Southampton SO171BJ, UK, www.ce.berkeley.edu/.../Ibbs_Liu_SystemDynamic_2005. pdf Accessed8/7/2011

Kaming, P., Olomolaiye, P., Holt, G., andHarris, F.1997. Factors influencing constructiontime and cost overruns on high-rise projects in Indonesia. Construct Management and Economics Vol 15 pp.83-94

Kombo, D., K., and Tromp, D.A. 2006. Proposal and thesis writing; an introduction;2nd reprint; Pauline Publication Africa;Kenya. www.wagner.nyu.edu/.../whatisresearch.php Accessed18/5/2011.

Kumaraswamy, M.M., and Chan, W.M. 1998. What contributes to construction delays. Journal of Construction Management & Economics, pg 17-29.

Lo, T. Y., Fung, I. W. H., Tung, K. C. F. 2006. 'Construction delays in Hong Kong civil engineering projects'. Journal of Construction Engineering and Management 132(6) 636-49. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636)

Miller, R., and Lessard, D. 2001. Understanding and managing risks in large engineering projects, International Journal of Project Management, 19, pp. 437-443.

Mills, A., 2001, A systematic approach to risk management for construction, Structural Survey, 19(5), pp. 245-252.

Noulmanee A, Wachirathamrojn J, Tantichattanont P, Sittivijan P.1999. Internal causes of delays in highway construction projects in Thailand. www.ait.c1et.comAccessed 9/5/2011.

Pickavance, K. 2005. Delay and disruption in construction contracts, 3rd edition. Informa Legal Publishing UK.

Ramabodu, M.S., and Verster, J.J.P. 2010. Factors Contributing to Cost Overruns ofConstruction Projects. In the proceeding of ASOCSA 5th Built Environment Conference, Durban South Africa.

Sambasivan, M and Soon, Y. W. 2007. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management 25 (2007) 517–526. www.nosazimadares.ir/fanni/doclib/causes Accessed 4/9/2012

Syed M. Ahmed, Salman Azhar, Mauricio Castillo and Pragnya Kappagantula. 2002. Construction Delays in Florida: An Empirical Studywww.cm.fiu.edu/pdfs/Research-Reports Accessed 4/9/2012

William M.K. Trochim. 2006 Research methods knowledge bases.

Zou, P. X.W., Zhang, G., and Wang, J. 2006. Identifying key risks in construction projects: life cycle and stakeholder perspectives. www.prress.net/papers/Zou_risks-construAccessed 4/9/2012

Refbacks

  • There are currently no refbacks.