Paz, J. C., Rozenboim, D., Cuadros, Álvaro, Cano, S. and Escobar, J. (2018) “A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks”, Construction Economics and Building, 18(2), pp. 41-69. doi: 10.5130/AJCEB.v18i2.5842.