[1]
Paz, J.C., Rozenboim, D., Cuadros, Álvaro, Cano, S. and Escobar, J. 2018. A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks. Construction Economics and Building. 18, 2 (Jun. 2018), 41-69. DOI:https://doi.org/10.5130/AJCEB.v18i2.5842.