[1]
Mat Isa, C.M., Mohd Saman, H. and Preece, C.N. 2014. Entry Location and Entry Timing (ELET) Decision Model for International Construction Firms. Construction Economics and Building. 14, 3 (Sep. 2014), 34-57. DOI:https://doi.org/10.5130/AJCEB.v14i3.4156.