[1]
Jaafar, M. and Mohd Radzi, N. 2013. Level of satisfaction and issues with procurement systems used in the Malaysian public sector. Construction Economics and Building. 13, 1 (Mar. 2013), 50-65. DOI:https://doi.org/10.5130/AJCEB.v13i1.2830.