[1]
Ng, A.K. and Price, A.D. 2010. Optimizing the Time Performance of Subcontractors in Building Projects. Construction Economics and Building. 10, 1-2 (Jul. 2010), 90 - 102. DOI:https://doi.org/10.5130/AJCEB.v10i1-2.1591.