[1]
2018. A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks. Construction Economics and Building. 18, 2 (June 2018), 41–69. DOI:https://doi.org/10.5130/AJCEB.v18i2.5842.