Abstract

Material waste in construction projects remains a significant issue, leading to increased costs, environmental impacts, and inefficiencies. This study addresses this challenge by prioritizing corrective actions to mitigate material waste that aligns with the unique condition of each construction site. Causes and corrective actions were firstly identified through a literature review, expert interviews, and a survey analysis. Next, principal component analysis simplified the dataset's complexity. Corrective actions were then prioritized using a quality function deployment (QFD) model, with the results validated by experts to assess the method's appropriateness for material wastage. The study appropriately introduced a process to prioritize the corrective actions aligning with identified causes and other actions. Additionally, 29 causes and 18 corrective actions were identified. Major causes included fire and explosion incidents, defective materials, and material theft. Key corrective actions were efficient project planning, accurate material management, and the implementation of comprehensive storage and handling procedures. Construction process supervision emerged as the highest priority, while reuse and recycling promotion, though ranked lowest, remained significant. This study introduced a systematic approach to prioritize corrective actions that addresses root causes and assesses the impact of each action on others, providing practical, cascading solutions to site-specific challenges.

Article Details

Section

Articles (Peer reviewed)

Author Biographies

Nhat Minh Huynh, Department of Construction Engineering and Management, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, District 10, Ho Chi Minh City, Vietnam

Department of Construction Engineering and Management, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, District 10, Ho Chi Minh City, Vietnam

 

Vietnam National University Ho Chi Minh City, Linh Trung Ward, Thu Duc City, Ho Chi Minh City, Vietnam

Long Le-Hoai, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), Viet Nam National University Ho Chi Minh City (VNU-HCM)

Department of Construction Engineering and Management, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT).

Phuong Trinh Bui, Department of Construction Materials, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, District 10, Ho Chi Minh City, Vietnam

Department of Construction Materials, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, District 10, Ho Chi Minh City, Vietnam

 

Vietnam National University Ho Chi Minh City, Linh Trung Ward, Thu Duc City, Ho Chi Minh City, Vietnam

My Ngoc Tang, Department of Construction Engineering and Management, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, District 10, Ho Chi Minh City, Vietnam

Department of Construction Engineering and Management, Faculty of Civil Engineering, Ho Chi Minh City University of Technology (HCMUT), 268 Ly Thuong Kiet Street, District 10, Ho Chi Minh City, Vietnam

 

Vietnam National University Ho Chi Minh City, Linh Trung Ward, Thu Duc City, Ho Chi Minh City, Vietnam

How to Cite

Prioritizing Corrective Actions to Mitigate Causes of Material Waste in Construction Using Quality Function Deployment. (2026). Construction Economics and Building, 26(2). https://doi.org/10.5130/y01p5b38

References

AJAYI, S. O. & OYEDELE, L. O. 2018. Critical design factors for minimising waste in construction projects: A structural equation modelling approach. Resources, conservation and recycling, 137, 302-313. https://doi.org/10.1016/j.resconrec.2018.06.005
AJAYI, S. O., OYEDELE, L. O., AKINADE, O. O., BILAL, M., ALAKA, H. A. & OWOLABI, H. A. 2017a. Optimising material procurement for construction waste minimization: An exploration of success factors. Sustainable materials and technologies, 11, 38-46. https://doi.org/10.1016/j.susmat.2017.01.001
AJAYI, S. O., OYEDELE, L. O., AKINADE, O. O., BILAL, M., ALAKA, H. A., OWOLABI, H. A. & KADIRI, K. O. 2017b. Attributes of design for construction waste minimization: A case study of waste-to-energy project. Renewable and Sustainable Energy Reviews, 73, 1333-1341. https://doi.org/10.1016/j.rser.2017.01.084
AJAYI, S. O., OYEDELE, L. O., BILAL, M., AKINADE, O. O., ALAKA, H. A. & OWOLABI, H. A. 2017c. Critical management practices influencing on-site waste minimization in construction projects. Waste management, 59, 330-339. https://doi.org/10.1016/j.wasman.2016.10.040
AKAO, Y. 1988. Quality function deployment. Productivity Press, Cambridge, MA.
AL-HAJJ, A. & HAMANI, K. 2011. Material waste in the UAE construction industry: Main causes and minimization practices. Architectural engineering and design management, 7, 221-235. https://doi.org/10.1080/17452007.2011.594576
ALWAN, Z., JONES, P. & HOLGATE, P. 2017. Strategic sustainable development in the UK construction industry, through the framework for strategic sustainable development, using Building Information Modelling. Journal of cleaner production, 140, 349-358. https://doi.org/10.1016/j.jclepro.2015.12.085
ARSHAD, H., QASIM, M., THAHEEM, J. & GABRIEL, H. F. 2017. Quantification of material wastage in construction industry of Pakistan: An analytical relationship between building types and waste generation. https://doi.org/10.21315/jcdc2017.22.2.2
BOLAR, A., TESFAMARIAM, S. & SADIQ, R. 2014. Management of civil infrastructure systems: QFD-based approach. Journal of Infrastructure Systems, 20, 04013009. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000150
DAINTY, A. R. & BROOKE, R. J. 2004. Towards improved construction waste minimisation: a need for improved supply chain integration? Structural Survey, 22, 20-29. https://doi.org/10.1108/02630800410533285
DEFRA 2008. Non-statutory guidance for site waste management plans. London: Department for the Environment, Food and Rural Affairs. https://www.guildford.gov.uk/media/35910/DEFRA-Non-statutory-guidance-for-site-waste-management-plans-2008/pdf/Defra_non-statutory_guidance_site_waste_management_plans.pdf?m=1707823031393
DODANWALA, T. C., SHRESTHA, P. & SANTOSO, D. S. 2021. Role conflict related job stress among construction professionals: The moderating role of age and organization tenure. Construction Economics and Building, 21, 21-37. http://dx.doi.org/10.5130/AJCEB.v21i4.7609
EKANAYAKE, L. & OFORI, G. 2000. Construction material waste source evaluation. Proceedings of the 2nd Southern African Conference on Sustainable Development in the Built Environment: Strategies for a Sustainable Built Environment, Pretoria, 2000. https://sid.ir/paper/619873/en
EKANAYAKE, L. L. & OFORI, G. 2004. Building waste assessment score: design-based tool. Building and environment, 39, 851-861. https://doi.org/10.1016/j.buildenv.2004.01.007
EPD 2008. Monitoring of solid waste in Hong Kong. Waste Statistics for 2007. https://www.wastereduction.gov.hk/sites/default/files/resources_centre/waste_statistics/msw2007_eng.pdf
ESA, M. R., HALOG, A. & RIGAMONTI, L. 2017. Strategies for minimizing construction and demolition wastes in Malaysia. Resources, Conservation and Recycling, 120, 219-229. https://doi.org/10.1016/j.resconrec.2016.12.014
ESIN, T. & COSGUN, N. 2007. A study conducted to reduce construction waste generation in Turkey. Building and environment, 42, 1667-1674. https://doi.org/10.1016/j.buildenv.2006.02.008
FORMOSO, C. T., SOIBELMAN, L., DE CESARE, C. & ISATTO, E. L. 2002. Material waste in building industry: main causes and prevention. Journal of construction engineering and management, 128, 316-325. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(316)
GÁLVEZ-MARTOS, J.-L., STYLES, D., SCHOENBERGER, H. & ZESCHMAR-LAHL, B. 2018. Construction and demolition waste best management practice in Europe. Resources, conservation and recycling, 136, 166-178. https://doi.org/10.1016/j.resconrec.2018.04.016
GUTHRIE, P., MALLETT, H. & ASSOCIATION, C. I. R. A. I. 1995. Waste minimisation and recycling in construction-A review. Construction Industry Research and Information Association. http://worldcat.org/isbn/086017428X
HUYNH, T. T.-M., DANG, C. N., LE-HOAI, L., PHAM, A.-D. & NGUYEN, T. D. 2020. Proposing a strategy map for coastal urban project success using the balanced scorecard method. Engineering, Construction and Architectural Management, 27, 2993-3030. https://doi.org/10.1108/ECAM-11-2018-0527
IKAU, R., JOSEPH, C. & TAWIE, R. 2016. Factors influencing waste generation in the construction industry in Malaysia. Procedia-social and behavioral sciences, 234, 11-18. https://doi.org/10.1016/j.sbspro.2016.10.213
JIA, S., YAN, G., SHEN, A. & ZHENG, J. 2017. Dynamic simulation analysis of a construction and demolition waste management model under penalty and subsidy mechanisms. Journal of cleaner production, 147, 531-545. https://doi.org/10.1016/j.jclepro.2017.01.143
KERN, A. P., DIAS, M. F., KULAKOWSKI, M. P. & GOMES, L. P. 2015. Waste generated in high-rise buildings construction: A quantification model based on statistical multiple regression. Waste Management, 39, 35-44. https://doi.org/10.1016/j.wasman.2015.01.043
KHALIL, A., RATHNASINGHE, A. P. & KULATUNGA, U. 2021. Challenges for the implementation of sustainable construction practices in Libya. Construction Economics and Building, 21, 243-261. http://dx.doi.org/10.5130/AJCEB.v21i3.7647
LIKERT, R. 1932. A technique for the measurement of attitudes. Archives of psychology, 22 140, 55. https://psycnet.apa.org/record/1933-01885-001
LINDHARD, S. M. 2024. Danish contractor's application of the budget: Identifying purpose and comparing the budgets application level across job-position. Construction Economics and Building, 24, 1-17. https://doi.org/10.5130/AJCEB.v24i4/5.8417
LINGARD, H., GILBERT, G. & GRAHAM, P. 2001. Improving solid waste reduction and recycling performance using goal setting and feedback. Construction Management and Economics, 19, 809-817. https://doi.org/10.1080/01446190110070952
LINGARD, H., GRAHAM, P. & SMITHERS, G. 2000. Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation. Construction Management & Economics, 18, 383-393. https://doi.org/10.1080/01446190050024806
LIU, J., YI, Y. & WANG, X. 2020. Exploring factors influencing construction waste reduction: A structural equation modeling approach. Journal of Cleaner Production, 276, 123185. https://doi.org/10.1016/j.jclepro.2020.123185
LU, W. & YUAN, H. 2011. A framework for understanding waste management studies in construction. Waste management, 31, 1252-1260. https://doi.org/10.1016/j.wasman.2011.01.018
LUANGCHAROENRAT, C., INTRACHOOTO, S., PEANSUPAP, V. & SUTTHINARAKORN, W. 2019. Factors influencing construction waste generation in building construction: Thailand’s perspective. Sustainability, 11, 3638. https://doi.org/10.3390/su11133638
LYMAN, D. Deployment normalization. Transactions from the Second Symposium on Quality Function Deployment, 1990. Automotive Division of the American Society for Quality Control, the American Supplier Institute, Inc., Dearborn, MI, and GOAL/QPC, Methuen, MA, 307-315.
MAHAMID, I. 2022. Impact of rework on material waste in building construction projects. International Journal of Construction Management, 22, 1500-1507. https://doi.org/10.1080/15623599.2020.1728607
MARHANI, M. A., JAAPAR, A., BARI, N. A. A. & ZAWAWI, M. 2013. Sustainability through lean construction approach: A literature review. Procedia-Social and Behavioral Sciences, 101, 90-99. https://doi.org/10.1016/j.sbspro.2013.07.182
MCDONALD, B. & SMITHERS, M. 1998. Implementing a waste management plan during the construction phase of a project: a case study. Construction Management & Economics, 16, 71-78. https://doi.org/10.1080/014461998372600
MCGRATH, C. 2001. Waste minimisation in practice. Resources, conservation and recycling, 32, 227-238. https://doi.org/10.1016/S0921-3449(01)00063-5
NIKMEHR, B., HOSSEINI, M. R., RAMEEZDEEN, R., CHILESHE, N., GHODDOUSI, P. & ARASHPOUR, M. 2017. An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management, 24, 1246-1268. https://doi.org/10.1108/ECAM-01-2016-0015
OKE, A. E., ATOFARATI, J. O. & BELLO, S. F. 2022. Awareness of 3D printing for sustainable construction in an emerging economy. Construction Economics and Building, 22, 52-68. https://doi.org/10.5130/AJCEB.v22i2.8015
OKO JOHN, A. & EMMANUEL ITODO, D. 2013. Professionals’ views of material wastage on construction sites and cost overruns. Organization, technology & management in construction: an international journal, 5, 747-757. https://doi.org/10.5592/otmcj.2013.1.11
OMARI, R. A., SWEIS, G., ABU-KHADER, W. & SWEIS, R. 2023. Barriers to the adoption of digitalization in the construction industry: Perspectives of owners, consultants, and contractors. Construction Economics and Building, 23, 87-106. https://doi.org/10.5130/AJCEB.v23i3/4.8636
OMEJE, H. O., OKEREKE, G. K. & CHUKWU, D. U. 2020. Construction waste reduction awareness: Action research. Journal of Teacher Education for Sustainability, 22, 66-83. https://doi.org/10.2478/jtes-2020-0006
OSMANI, M. 2011. Construction Waste. Chap. 15 in Waste: A handbook for management, by Letcher and Vallero, 1-565. San Diego: Academic Press an imprint of Elsevier. https://doi.org/10.1016/B978-0-12-381475-3.10034-8
OSMANI, M., GLASS, J. & PRICE, A. 2006. Architect and contractor attitudes to waste minimisation. Proceedings of the Institution of Civil Engineers-waste and resource management, 159, 65-72. https://doi.org/10.1680/warm.2006.159.2.65
PAUL, C. A., AGHIMIEN, D. O., IBRAHIM, A. D. & IBRAHIM, Y. M. 2021. Measures for curbing unethical practices among construction industry professionals: Quantity surveyors' perspective. Construction Economics and Building, 21, 1-17. http://dx.doi.org/10.5130/AJCEB.v21i2.7134
PENG, C.-L., SCORPIO, D. E. & KIBERT, C. J. 1997. Strategies for successful construction and demolition waste recycling operations. Construction Management & Economics, 15, 49-58. https://doi.org/10.1080/014461997373105
PICKSON, R. B. & HE, G. 2021. Smallholder farmers’ perceptions, adaptation constraints, and determinants of adaptive capacity to climate change in Chengdu. Sage Open, 11, 21582440211032638. https://doi.org/10.1177/21582440211032638
POON, C. 2007. Reducing construction waste. Waste management, 27, 1715-1716. https://doi.org/10.1016/j.wasman.2007.08.013
POON, C. S., ANN, T. & NG, L. 2001. On-site sorting of construction and demolition waste in Hong Kong. Resources, conservation and recycling, 32, 157-172. https://doi.org/10.1016/S0921-3449(01)00052-0
POVETKIN, K. & ISAAC, S. 2020. Identifying and addressing latent causes of construction waste in infrastructure projects. Journal of cleaner production, 266, 122024. https://doi.org/10.1016/j.jclepro.2020.122024
RASHEED, N., SHAHZAD, W. M. & ROTIMI, J. O. B. 2024. Factor Analysis of Risk Allocation Criteria (RAC) in Public-Private Partnership (PPP) Projects: A Case of New Zealand. Construction Economics and Building, 24, 142-159. https://doi.org/10.5130/AJCEB.v24i4/5.9021
SAATY, T. L. 1977. A scaling method for priorities in hierarchical structures. Journal of mathematical psychology, 15, 234-281. https://doi.org/10.1016/0022-2496(77)90033-5
SAUNDERS, J. & WYNN, P. 2004. Attitudes towards waste minimisation amongst labour only sub‐contractors. Structural Survey, 22, 148-155. https://doi.org/10.1108/02630800410549044
SOBIERAJ, J. & METELSKI, D. 2023. Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23, 1-12. https://doi.org/10.1080/15623599.2020.1844855
TAM, V. W. & TAM, C. M. 2006. A review on the viable technology for construction waste recycling. Resources, conservation and recycling, 47, 209-221. https://doi.org/10.1016/j.resconrec.2005.12.002
TAM, V. W. & TAM, C. M. 2008. Waste reduction through incentives: a case study. Building Research & Information, 36, 37-43. https://doi.org/10.1080/09613210701417003
TEO, M. M. M. 2000. Operatives' attitudes towards waste on construction projects. Doctoral dissertation, UNSW Sydney. https://doi.org/10.26190/unsworks/13746
ULUBEYLI, S., KAZAZ, A. & ARSLAN, V. 2017. Construction and demolition waste recycling plants revisited: management issues. Procedia Engineering, 172, 1190-1197. https://doi.org/10.1016/j.proeng.2017.02.139
UMAR, U. A., SHAFIQ, N., MALAKAHMAD, A., NURUDDIN, M. F. & KHAMIDI, M. F. 2017. A review on adoption of novel techniques in construction waste management and policy. Journal of Material Cycles and Waste Management, 19, 1361-1373. https://doi.org/10.1007/s10163-016-0534-8
UPADHYAYA, D. & MALEK, M. S. 2024. An exploratory factor analysis approach to investigate health and safety factors in Indian construction sector. Construction Economics and Building, 24, 29-49. https://doi.org/10.5130/AJCEB.v24i1/2.8867
WANG, J., LI, Z. & TAM, V. W. 2015. Identifying best design strategies for construction waste minimization. Journal of cleaner production, 92, 237-247. https://doi.org/10.1016/j.jclepro.2014.12.076
WANG, J., WU, H., TAM, V. W. & ZUO, J. 2019. Considering life-cycle environmental impacts and society's willingness for optimizing construction and demolition waste management fee: An empirical study of China. Journal of cleaner production, 206, 1004-1014. https://doi.org/10.1016/j.jclepro.2018.09.170
WARP 2007. Efficient Construction Logistics. Waste and Resources Action Programme: Banbury.
WASSERMAN, G. S. 1993. On how to prioritize design requirements during the QFD planning process. IIE transactions, 25, 59-65. https://doi.org/10.1080/07408179308964291
WON, J., CHENG, J. C. & LEE, G. 2016. Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea. Waste Management, 49, 170-180. https://doi.org/10.1016/j.wasman.2015.12.026
WRAP 2007. Reducing Material Wastage in Construction. Waste and Resources Action Programme: Banbury.
YATES, J. 2013. Sustainable methods for waste minimisation in construction. Construction Innovation, 13, 281-301. https://doi.org/10.1108/CI-Nov-2011-0054
YUAN, H. 2013. A SWOT analysis of successful construction waste management. Journal of cleaner production, 39, 1-8. https://doi.org/10.1016/j.jclepro.2012.08.016
YUAN, H., LU, W. & HAO, J. J. 2013. The evolution of construction waste sorting on-site. Renewable and Sustainable Energy Reviews, 20, 483-490. https://doi.org/10.1016/j.rser.2012.12.012