Proactive contract theory-based resilience framework development for Public-Private Partnerships

Main Article Content

THARUN DOLLA
Nicola
Ganesh
Boeing Laishram

Abstract

Public-private partnerships (PPPs) are long-term contracts spanning many decades and are susceptible to failure due to dynamic changes such as crises within the contract period. The impending need to incorporate resilience to sustain the impacts of unexpected events on projects and contractual structures compelled this review of the PPP literature. This is to understand and unravel how and in what manner PPPs are undergirded by resilience.  Using a systematic literature review methodology, a critical search from 1997 to 2023 for relevant publications in the Scopus and Web of Science databases yielded 71601 papers. Further screening using filtering criteria and selection from 12 leading journals in PPP studies resulted in a final set of 116 publications, which were then analysed using NVivo. This analysis led to the organisation of contained knowledge to form a resilience framework based on proactive-preventive contract theory. The findings revealed that the primary layer of resilience focuses on keeping the cause of the problem from arising in first place through flexible contract mechanisms, concession period optimisation, and governance strategies; the secondary resilience intends to interrupt the cause and effect through revenue guarantee options, financial viability and capital structure, and risk allocation and management; and the tertiary resilience is about minimising the damage of any unwanted occurrences such as crisis through conflicts and resolution mechanisms and the renegotiation framework. This review synthesised the accumulated PPP resilience knowledge to be used by practitioners while handling the projects – both procured and in pipeline – through the reviewed suggestions and strategies.

Article Details

Section

Articles (Peer reviewed)

How to Cite

Proactive contract theory-based resilience framework development for Public-Private Partnerships. (2025). Construction Economics and Building, 25(2). https://doi.org/10.5130/AJCEB.v25i2.9273

References

Akomea-Frimpong, I., Jin, X. and Osei-Kyei, R. (2021), “A holistic review of research studies on financial risk management in public–private partnership projects”, Engineering, Construction and Architectural Management, Emerald Publishing Limited, Vol. 28 No. 9, pp. 2549–2569, doi: 10.1108/ECAM-02-2020-0103.
Akomea-Frimpong, I., Jin, X., Osei-Kyei, R. and Tumpa, R.J. (2022), “A critical review of public–private partnerships in the COVID-19 pandemic: key themes and future research agenda”, Smart and Sustainable Built Environment, Emerald Publishing Limited, Vol. in press No. 4, pp. 701–720, doi: 10.1108/SASBE-01-2022-0009.
Ashuri, B., Kashani, H., Molenaar, K.R., Lee, S. and Lu, J. (2012), “Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options”, Journal of Construction Engineering and Management, Vol. 138 No. 4, pp. 545–557, doi: 10.1061/(asce)co.1943-7862.0000447.
Attarzadeh, M., Chua, D.K.H., Beer, M. and Abbott, E.L.S. (2017), “Options-based negotiation management of PPP–BOT infrastructure projects”, Construction Management and Economics, Vol. 35 No. 11–12, pp. 676–692, doi: 10.1080/01446193.2017.1325962.
Bae, D.S., Damnjanoic, I. and Kang, D.H. (2019), “PPP Renegotiation Framework based on Equivalent NPV Constraint in the Case of BOT Project: Incheon Airport Highway, South Korea”, KSCE Journal of Civil Engineering, Vol. 23 No. 4, pp. 1473–1483, doi: 10.1007/s12205-019-1444-9.
Berger-Walliser, G. (2010), “The Past and Future of Proactive Law: An Overview of the Development of the Proactive Law Movement”, The Past and Future of Proactive Law, Vol. 49, pp. 13–31.
Bhamra, R., Dani, S. and Burnard, K. (2011), “Resilience: the concept, a literature review and future directions”, Https://Doi.Org/10.1080/00207543.2011.563826, Taylor & Francis Group , Vol. 49 No. 18, pp. 5375–5393, doi: 10.1080/00207543.2011.563826.
Braun, V. and Clarke, V. (2006), “Using thematic analysis in psychology”, Qualitative Research in Psychology, Vol. 3 No. 2, pp. 77–101, doi: 10.1191/1478088706qp063oa.
Brown, L.M. (1983), Manual for Periodic Legal Checkup, Butterworth Legal Publishers.
Buyukyoran, F. and Gundes, S. (2018), “Optimized real options-based approach for government guarantees in PPP toll road projects”, Construction Management and Economics, Vol. 36 No. 4, pp. 203–216, doi: 10.1080/01446193.2017.1347267.
Carbonara, N., Costantino, N. and Pellegrino, R. (2014), “Revenue guarantee in public-private partnerships: a fair risk allocation model”, Construction Management and Economics, Vol. 32 No. 4, pp. 403–415, doi: 10.1080/01446193.2014.906638.
Casady, C.B. and Baxter, D. (2020), “Pandemics, public-private partnerships (PPPs), and force majeure-COVID-19 expectations and implications”, Construction Management and Economics, Vol. 38 No. 12, pp. 1077–1085, doi: 10.1080/01446193.2020.1817516.
Castelblanco, G., Guevara, J. and Mendez-Gonzalez, P. (2022), “In the Name of the Pandemic: A Case Study of Contractual Modifications in PPP Solicited and Unsolicited Proposals in COVID-19 Times”, Construction Research Congress 2022, pp. 50–58, doi: 10.1061/9780784483978.006.
Castelblanco, G., Guevara, J. and Salazar, J. (2022), “Remedies to the PPP Crisis in the Covid-19 Pandemic: Lessons from the 2008 Global Financial Crisis”, Journal of Management in Engineering, Vol. 38 No. 3, pp. 1–18, doi: 10.1061/(ASCE)ME.1943-5479.0001036.
de Castro e Silva Neto, D., Cruz, C.O., Rodrigues, F. and Silva, P. (2016), “Bibliometric Analysis of PPP and PFI Literature: Overview of 25 Years of Research”, Journal of Construction Engineering and Management, Vol. 142 No. 10, pp. 06016002-1–8, doi: 10.1061/(ASCE)CO.1943-7862.0001163.
Cheah, C.Y.J. and Liu, J. (2006), “Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation”, Construction Management and Economics, Vol. 24 No. 5, pp. 545–554, doi: 10.1080/01446190500435572.
Chen, C., Lv, L., Wang, Z. and Qiao, R. (2022), “Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects”, Engineering, Construction and Architectural Management, Emerald Publishing Limited, Vol. in press, doi: 10.1108/ECAM-11-2021-1006.
Chen, Q., Shen, G., Xue, F. and Xia, B. (2018), “Real Options Model of Toll-Adjustment Mechanism in Concession Contracts of Toll Road Projects”, Journal of Management in Engineering, Vol. 34 No. 1, p. 4017040, doi: doi:10.1061/(ASCE)ME.1943-5479.0000558.
Chen, T.-C., Lin, Y.-C. and Wang, L.-C. (2012), “The analysis of BOT strategies based on game theory - Case study on Taiwan’s high speed railway project”, Journal of Civil Engineering and Management, Vol. 18 No. 5, pp. 662–674, doi: 10.3846/13923730.2012.723329.
Cheng, M., Liu, G. and Xu, Y. (2021), “Can joint-contract functions promote PPP project sustainability performance? A moderated mediation model”, Engineering, Construction and Architectural Management, Vol. 28 No. 9, pp. 2667–2689, doi: 10.1108/ECAM-06-2020-0419.
Cruz, C.O. and Marques, R.C. (2013), “Flexible contracts to cope with uncertainty in public-private partnerships”, International Journal of Project Management, Elsevier Ltd and IPMA., Vol. 31 No. 3, pp. 473–483, doi: 10.1016/j.ijproman.2012.09.006.
Delhi, V.S.K. and Mahalingam, A. (2020), “Relating Institutions and Governance Strategies to Project Outcomes: Study on Public–Private Partnerships in Infrastructure Projects in India”, Journal of Management in Engineering, Vol. 36 No. 6, p. 04020076, doi: 10.1061/(asce)me.1943-5479.0000840.
Devkar, G., Palliyaguru, R. and Sabitu, A. (2020), “The effects of institutional frameworks on implementation of PPP projects : a comparative perspective in Australia and India”, International Journal of Construction Management, Taylor & Francis, Vol. 20 No. 6, pp. 720–736, doi: 10.1080/15623599.2020.1769255.
Dewulf, G. and Garvin, M.J. (2020), “Responsive governance in PPP projects to manage uncertainty”, Construction Management and Economics, Vol. 38 No. 4, pp. 383–397, doi: 10.1080/01446193.2019.1618478.
Dolla, T. and Laishram, B. (2020), “Bundling in public–private partnership projects – a conceptual framework”, International Journal of Productivity and Performance Management, Emerald Publishing Limited, Vol. 69 No. 6, pp. 1177–1203, doi: 10.1108/IJPPM-02-2019-0086.
Eldosouky, A.R., Saad, W. and Mandayam, N. (2021), “Resilient critical infrastructure: Bayesian network analysis and contract-Based optimization”, Reliability Engineering & System Safety, Elsevier, Vol. 205, p. 107243, doi: 10.1016/J.RESS.2020.107243.
Eshun, B.T.B., Chan, A.P.C. and Osei-Kyei, R. (2021), “Conceptualizing a win–win scenario in public–private partnerships: evidence from a systematic literature review”, Engineering, Construction and Architectural Management, Vol. 28 No. 9, pp. 2712–2735, doi: 10.1108/ECAM-07-2020-0533.
FARCA, L.-A. and DRAGOŞ, D.C. (2020), “Resilience in Times of Pandemic: Is the Public Procurement Legal Framework Fit for Purpose?”, Transylvanian Review of Administrative Sciences, Vol. 2020 No. Special Issue 2020, pp. 60–79, doi: 10.24193/tras.SI2020.4.
Feng, X., Cao, J., Wu, G. and Duan, K. (2022), “A critical review of studies on renegotiation within the public-private partnerships (PPPs) scheme”, Engineering, Construction and Architectural Management, Emerald Publishing Limited, Vol. in press, doi: 10.1108/ECAM-09-2021-0790.
Furmston, M. (Ed.). (2020), The Future of the Law of Contract, Informa Law from Routledge, Abingdon, Oxon ; New York, NY : Routledge, 2020. | Series: Markets and the law, doi: 10.4324/9780429056550.
Garmestani, A.S., Allen, C.R., Benson, M.H., Garmestani, A.S., Allen, C.R. and Benson, M.H. (2013), “Can Law Foster Social-Ecological Resilience?”, Ecology and Society, Published Online: Jun 27, 2013 | Doi:10.5751/ES-05927-180237, The Resilience Alliance, Vol. 18 No. 2, doi: 10.5751/ES-05927-180237.
Guo, J., Chen, J. and Xie, Y. (2022), “Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory”, Engineering, Construction and Architectural Management, Emerald Publishing Limited, Vol. 29 No. 3, pp. 1396–1426, doi: 10.1108/ECAM-11-2019-0612.
Guo, K., Zhang, L. and Wang, T. (2021), “Concession period optimisation in complex projects under uncertainty: a public–private partnership perspective”, Construction Management and Economics, Vol. 39 No. 2, pp. 156–172, doi: 10.1080/01446193.2020.1849752.
Haapio, H. (2007), “An ounce of prevention--contracting for project success and problem prevention”, PMI® Global Congress 2007, pp. 1–10.
Haapio, H. (2010), “Business Success and Problem Prevention through Proactive Contracting”, Scandinavian Studies in Law, Vol. 49, pp. 150–194.
Hasan, S., Elwakil, E. and Hegab, M. (2021), “Opportunities for Infrastructure PPP Projects in Time of COVID-19 - As a Resilience Strategy”, 2021 IEEE Conference on Technologies for Sustainability, SusTech 2021, IEEE, pp. 1–5, doi: 10.1109/SusTech51236.2021.9467426.
Hietanen-Kunwald, P. and Haapio, H. (2021), “Effective dispute prevention and resolution through proactive contract design”, Journal of Strategic Contracting and Negotiation, SAGE Publications, Vol. 5 No. 1–2, pp. 3–23, doi: 10.1177/20555636211016878.
Ho, S.P. and Liu, L.Y. (2002), “An option pricing-based model for evaluating the financial viability of privatized infrastructure projects”, Construction Management and Economics, Vol. 20 No. 2, pp. 143–156, doi: 10.1080/01446190110110533.
Hou, W. and Wang, L. (2022), “Research on the refinancing capital structure of highway PPP projects based on dynamic capital demand”, Engineering, Construction and Architectural Management, Emerald Publishing Limited, Vol. 29 No. 5, pp. 2047–2072, doi: 10.1108/ECAM-05-2020-0321.
Huang, Y.L. and Pi, C.C. (2014), “Real-option valuation of build-operate-transfer infrastructure projects under performance bonding”, Journal of Construction Engineering and Management, Vol. 140 No. 5, doi: 10.1061/(ASCE)CO.1943-7862.0000821.
Jeong, J., Ji, C., Hong, T. and Park, H.S. (2016), “Model for Evaluating the Financial Viability of the BOT Project for Highway Service Areas in South Korea”, Journal of Management in Engineering, Vol. 32 No. 2, p. 4015036, doi: doi:10.1061/(ASCE)ME.1943-5479.0000396.
Jie, L.I. (2009), “Dynamic contract conditions for built operation transfer (bot) projects in China”, International Journal of Construction Management, Vol. 9 No. 2, pp. 55–64, doi: 10.1080/15623599.2009.10773129.
Jin, H., Liu, S., Li, J. and Liu, C. (2020), “A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs”, International Journal of Construction Management, Taylor & Francis, Vol. 20 No. 6, pp. 642–652, doi: 10.1080/15623599.2020.1738003.
Jin, X.H. and Doloi, H. (2008), “Interpreting risk allocation mechanism in public-private partnership projects: An empirical study in a transaction cost economics perspective”, Construction Management and Economics, Vol. 26 No. 7, pp. 707–721, doi: 10.1080/01446190801998682.
Ke, Y., Wang, S., Chan, A.P. and Cheung, E. (2009), “Research Trend of Public-Private Partnership in Construction Journals”, Journal of Construction Engineering and Management, Vol. 135 No. 10, pp. 1076–1086, doi: 10.1061/(ASCE)0733-9364(2009)135:10(1076).
Khanzadi, M., Nasirzadeh, F. and Alipour, M. (2012), “Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects”, Automation in Construction, Vol. 22, pp. 368–376, doi: https://doi.org/10.1016/j.autcon.2011.09.015.
Liu, J., Gao, R. and Cheah, C.Y.J. (2017), “Pricing Mechanism of Early Termination of PPP Projects Based on Real Option Theory”, Journal of Management in Engineering, Vol. 33 No. 6, p. 4017035, doi: doi:10.1061/(ASCE)ME.1943-5479.0000556.
PPIAF. (2021), “COVID-19 and Public-Private Partnerships Practice Notes: Assessing the Impact of COVID-19 on PPP Pipelines and Projects in Preparation”, Public-Private Infrastructure Advisory Facility, The World Bank.
PPPLRC. (2020), “PPP Legal Framework Practice Note: Post-Covid-19”, Public-Private Partnership Legal Resource Center, World Bank Group.
Regan, M., Smith, J. and Love, P.E.D. (2011), “Impact of the capital market collapse on public-private partnership infrastructure projects”, Journal of Construction Engineering and Management, Vol. 137 No. 1, pp. 6–16, doi: 10.1061/(ASCE)CO.1943-7862.0000245.
Sharafi, A., Sadegh Amalnick, M. and Allah Taleizadeh, A. (2021), “Outcome of Financial Conflicts in the Operation Phase of Public–Private Partnership Contracts”, Journal of Construction Engineering and Management, Vol. 147 No. 6, p. 04021047, doi: 10.1061/(asce)co.1943-7862.0002011.
Sherratt, F., Sherratt, S. and Ivory, C. (2020), “Challenging complacency in construction management research: the case of PPPs”, Construction Management and Economics, Vol. 38 No. 12, pp. 1086–1100, doi: 10.1080/01446193.2020.1744674.
Song, J., Hu, Y. and Feng, Z. (2018), “Factors Influencing Early Termination of PPP Projects in China”, Journal of Management in Engineering, Vol. 34 No. 1, doi: 10.1061/(ASCE)ME.1943-5479.0000572.
Soomro, M.A. and Zhang, X. (2016), “Evaluation of the Functions of Public Sector Partners in Transportation Public-Private Partnerships Failures”, Journal of Management in Engineering, Vol. 32 No. 1, pp. 1–11, doi: 10.1061/(ASCE)ME.1943-5479.0000387.
Sundararajan, S.K. and Tseng, C.-L. (2017), “Managing Project Performance Risks under Uncertainty: Using a Dynamic Capital Structure Approach in Infrastructure Project Financing”, Journal of Construction Engineering and Management, Vol. 143 No. 8, p. 4017046, doi: 10.1061/(ASCE)CO.1943-7862.0001341.
Sutcliffe, K.M. and Vogus, T.J. (1981), “Organizing for Resilience”, pp. 1–12.
Tariq, S. and Zhang, X. (2021), “Critical Analysis of the Private Sector Roles in Water PPP Failures”, Journal of Construction Engineering and Management, Vol. 147 No. 4, p. 04021015, doi: 10.1061/(asce)co.1943-7862.0002020.
The World Bank. (2018), Procuring Infrastructure Public-Private Partnerships Report, doi: doi:10.1596/29605.
Tieva, A. and Junnonen, J.M. (2010), “Proactive contracting in finnish ppp projects”, Vilnius Gediminas Technical University, Taylor & Francis Group , Vol. 13 No. 3, pp. 219–228, doi: 10.3846/1648-715X.2009.13.219-228.
Tranfield, D., Denyer, D. and Smart, P. (2003), “Towards a Methodology for Developing Evidence-Informed Management Knowledge by Means of Systematic Review”, British Journal of Management, Vol. 14 No. 3, pp. 207–222, doi: 10.1111/1467-8551.00375.
Vassallo, J.M., Ortega, A. and Baeza, M.D.L.Á. (2012), “Impact of the economic recession on toll highway concessions in Spain”, Journal of Management in Engineering, Vol. 28 No. 4, pp. 398–406, doi: 10.1061/(ASCE)ME.1943-5479.0000108.
Wang, Y. and Jin, X. (2019), “Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example”, Engineering, Construction and Architectural Management, Emerald Publishing Limited, Vol. 26 No. 7, pp. 1348–1366, doi: 10.1108/ECAM-07-2018-0259.
Xiong, W. and Zhang, X. (2016), “The Real Option Value of Renegotiation in Public–Private Partnerships”, Journal of Construction Engineering and Management, Vol. 142 No. 8, pp. 1–11, doi: 10.1061/(asce)co.1943-7862.0001130.
Xiong, W., Zhao, X., Yuan, J.-F. and Luo, S. (2017), “Ex Post Risk Management in Public-Private Partnership Infrastructure Projects”, Project Management Journal, Vol. 48 No. 3, pp. 76–89, doi: 10.1177/875697281704800305.
Zhang, H., Yu, L. and Zhang, W. (2020), “Dynamic performance incentive model with supervision mechanism for PPP projects”, Engineering, Construction and Architectural Management, Vol. 27 No. 9, pp. 2643–2659, doi: 10.1108/ECAM-09-2019-0472.
Zhang, S., Chan, A.P.C., Feng, Y., Duan, H. and Ke, Y. (2016), “Critical review on PPP Research - A search from the Chinese and International Journals”, International Journal of Project Management, Vol. 34 No. 4, pp. 597–612, doi: 10.1016/j.ijproman.2016.02.008.
Zhang, X., Bao, H., Wang, H. and Skitmore, M. (2016), “A model for determining the optimal project life span and concession period of BOT projects”, International Journal of Project Management, Vol. 34 No. 3, pp. 523–532, doi: 10.1016/j.ijproman.2016.01.005.
Zhang, X. and Soomro, M.A. (2016), “Failure Path Analysis with Respect to Private Sector Partners in Transportation Public-Private Partnerships”, Journal of Management in Engineering, Vol. 32 No. 1, p. 4015031, doi: 10.1061/(ASCE)ME.1943-5479.0000384.
Zhang, Y.-C., Luo, W.-Z., Shan, M., Pan, D.-W. and Mu, W.-J. (2020), “Systematic analysis of PPP research in construction journals: from 2009 to 2019”, Engineering, Construction and Architectural Management, Vol. 27 No. 10, pp. 3309–3339, doi: 10.1108/ECAM-03-2020-0178.