Numerous factors affect the performance of construction projects. The goal of this paper is twofold: first, to identify and determine the negative factors influencing construction projects, and second, to specify the hypothesised causal relations between the observed and hidden variables using a confirmatory factor analysis (CFA) model. A deductive research approach and a cross-sectional design method were chosen for the study. A literature review was first conducted, and 66 negative variables were identified. The factors were modified and designed into a questionnaire for data collection. The Cronbach alphas of the three components indicate a high degree of internal consistency. The measurement variables adequately measure the negative factor construct. In addition, the fit indices suggest that the postulated model sufficiently describes the dataset. Poor environmental practices (PAS2), inadequate environmental legislative framework to address modern environmental concerns in the delivery of construction projects (PAS1), and non-inclusion of occupational health and safety in contracts (PAS3) were identified as three relevant negative factors impacting project performance. The paper identified poor assessment strategies, weak management systems, and inefficient regulatory systems as the significant latent factors that affect performance. According to the findings, a poor assessment strategy is more consequential. The results of the study suggest that poor assessment strategies, weak management systems, and inefficient regulatory systems can lead to worsening health and safety conditions in the construction industry, as well as environmental violations and poor environmental practices. The government should enact adequate health and safety and environmental and local community protection laws to protect the environment and local communities during construction. Clients must liaise with consultants to incorporate sufficient health and safety clauses into construction contracts and ensure judicious compliance by contractors. To reduce corruption in the construction sector, the government should strengthen its anti-corruption mechanisms.
Article Details
Section
Authors who publish with this journal agree to the following terms:
a) Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share and adapt the work with an acknowledgement of the work's authorship and initial publication in this journal.
b) Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
c) Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Open Access Citation Advantage Service). Where authors include such a work in an institutional repository or on their website (ie. a copy of a work which has been published in a UTS ePRESS journal, or a pre-print or post-print version of that work), we request that they include a statement that acknowledges the UTS ePRESS publication including the name of the journal, the volume number and a web-link to the journal item.
d) Authors should be aware that the Creative Commons Attribution (CC-BY) License permits readers to share (copy and redistribute the work in any medium or format) and adapt (remix, transform, and build upon the work) for any purpose, even commercially, provided they also give appropriate credit to the work, provide a link to the license, and indicate if changes were made. They may do these things in any reasonable manner, but not in any way that suggests you or your publisher endorses their use.
How to Cite
References
Adebowale, O.J. and Agumba. J.N., 2021. A Meta-Analysis of factors affecting labour productivity of construction SMEs in developing countries. Journal of Engineering, Design and Technology, [e-journal] Vol. ahead-of-print No. ahead-of-print. 10.1108/JEDT-05-2021-0277.
Adeleke, A.Q., Bahaudin, A.Y., Kamaruddeen, A.M., Bamgbade, J.A. and Ali, M.W., 2019. An empirical analysis of organizational external factors on construction risk management. International Journal of Supply Chain Management, 8(1), pp. 932-940.
Adzivor, E.K., Emuze, F. and Das, D.K., 2022. Indicators for safety culture in SME construction firms: a Delphi study in Ghana. Journal of Financial Management of Property and Construction, [e-journal] pp.1366-4387. 10.1108/JFMPC-04-2022-0020.
Agyekum, K., Simons, B. and Botchway, S., 2018. Factors influencing the performance of safety programmes in the Ghanaian construction industry. Acta Structilia, [e-journal] 25(2), pp.39-6. 10.18820/24150487/as25i2.2.
Agyekum, K., Ghansah, F.A., Tetteh, P.A. and Amudjie, J., 2021. The role of project managers (PMs) in construction health and safety implementation in Ghana. Journal of Engineering, Design and Technology, [e-journal] 19(1), pp.245-262. 10.1108/JEDT-04-2020-0122.
Agyekum, K., Goodier, C. and Oppon, J.A., 2022. Key drivers for green building project financing in Ghana. Engineering, Construction and Architectural Management, [e-journal] 29(8), pp.3023-3050. 10.1108/ECAM-02-2021-0131.
Ahadzie, D. 2008. A model for predicting the performance of project managers in mass housing building projects in Ghana. Ph. D. Wolverhampton University. Available at:
Ahmed, S., Haq, I. and Anam, S.A., 2022. Impacts of COVID-19 on the construction sector in the least developed countries. International Journal of Building Pathology and Adaptation, [e-journal] Vol. ahead-of-print No. ahead-of-print. 10.1108/IJBPA-04-2022-0059.
Ajayi, A.A., Babalola, O. Oyeyipo, O. and Anjorin-Ohu, A., 2021. Examining the quality performance of indigenous and expatriate contractors in Nigeria: clients’ perspective. The Journal of Accounting and Management, 11(2). Available at:
Akomah, B.B. and Nani, G. 2018. Redefining corrupt public procurement practices in Ghana based on stakeholders’ perception. International Journal of Innovative Research and Development, [e-journal] 7(9), pp.15-23. 10.24940/ijird/2018/v7/i9/SEP18017.
Akomah, B.B. and Ramani, P.V., 2023. Local government institutions in Ghana: Core partners in health and safety performance in the construction industry. Heliyon, [e-journal] 9(2023), p.e19423. 10.1016/j.heliyon.2023.e19423.
Akomah, B.B., Boakye, N.A. and Fugar. R., 2010. Safety on construction sites: the role of the employer and employee. In: Laryea, S., Leiringer, R. and Hughes, W., 2010 West Africa Built Environment Research Conference (WABER). Accra, Republic of Ghana, 27-28 July 2010. Accra: British Council.
Akpa, V.O., Mowaiye, B., Akinlabi, B.H. and Magaji, N., 2022. Effect of green human resource management practices and green work life balance on employee retention in selected hospitality firms in Lagos and Ogun states, Nigeria. European Journal of Human Resource Management Studies, [e-journal] 5(4), pp.129-142. 10.46827/ejhrms.v5i4.1265.
Alabi, B. and Fapohunda, J., 2021. Effects of increase in the cost of building materials on the delivery of affordable housing in South Africa. Sustainability, [e-journal] 13(4), p.1772. 10.3390/su13041772.
Ali, Y., Saad, T.B., Sabir,M., Muhammad, N., Salman,A. and Zeb, K., 2020. Integration of green supply chain management practices in construction supply chain of CPEC. Management of Environmental Quality: An International Journal, [e-journal] 31(1), pp.185-200. 10.1108/MEQ-12-2018-0211.
Al-Kofahi, Z.G., Mahdavian, A. and Oloufa, A., 2022. System dynamics modelling approach to quantify change orders impact on labour productivity 1: Principles and model development comparative study. International Journal of construction management, 22(7), pp.1355-1366. 10.1080/15623599.2020.1711494.
AlMunifi, A.A. and Almutairi, S., 2021. Lessons learned framework for efficient delivery of construction projects in Saudi Arabia. Construction Economics and Building, [e-journal] 21(4), pp.115-141. 10.5130/AJCEB.v21i4.7858.
Ameyaw, E.E., Parn, E., Chan, A.P.C., Owusu-Manu, D.G., Edwards, D.J. and Darko, A., 2017. Corrupt practices in the construction industry: survey of Ghanaian experience. Journal of Management Engineering, [e-journal] 33(6), p.05017006. 10.1061/(ASCE)ME.1943-5479.0000555.
Amoah, C., 2023. Quality management framework for government social housing construction in South Africa. International Journal of Building Pathology and Adaptation, [e-journal] 41(6), pp.217-236. 10.1108/IJBPA-10-2022-0169.
Amoah, P., Ahadzie, D.K. and Dansoh, A., 2007. The factors affecting construction performance: the perspective of small-scale in Ghana building contractors. The Ghana Surveyor Journal, 4(1), pp.41-48.
Annamalaisami, C.D. and Kuppuswamy, A., 2021. Managing cost risks: toward a taxonomy of cost overrun factors in building construction projects. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, [e-journal] 7(2), p.04021021. 10.1061/AJRUA6.00011.
Anyango, A., 2020. Top construction companies in Ghana, construction review online. Available at:
Ayat, M., Rehman, H., Qureshi, S.M. and Kang, C.W., 2021. Assessing the causes of project overruns in tunnel construction projects in Pakistan. International Journal of Construction Management, [e-journal], pp.1-11. 10.1080/15623599.2021.2017541.
Ayat, M., Rehman, H., Qureshi, S. M. and Kang, C.W., 2023. Assessing the causes of project overruns in tunnel construction projects in Pakistan. International Journal of Construction Management, [e-journal] 23(11), pp.1856-1866. 10.1080/15623599.2021.2017541.
Babalola, A., and N. Harinarain. 2021. Policy barriers to sustainable construction practice in the Nigerian construction industry: an exploratory factor analysis. Journal of Engineering, Design and Technology, [e-journal] Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/JEDT-07-2021-0375.
Bagozzi, R.P., and Yi., Y. 2012. Specification, evaluation, and interpretation of structural equation models. Journal of the Academy of Marketing Science, [e-journal] 40(1), pp.8-34. 10.1007/s11747-011-0278-x.
Barutha, P.J., Jeong, H.D., Gransberg, D.D. and Touran, A., 2021. Evaluation of the impact of collaboration and integration on performance of industrial projects. Journal of Management in Engineering, [e-journal] 37(4), p.04021037. 10.1061/(ASCE)ME.1943-5479.00009.
Bhandari, S., Hallowell, M.R., Boven, L.V., Welker, K.M., Golparvar-Fard, M. and Gruber, J., 2020. Using augmented virtuality to examine how emotions influence construction-hazard identification, risk assessment, and safety decisions. Journal of Construction Engineering and Management, [e-journal] 146(2), p.04019102. 10.1061/(ASCE)CO.1943-7862.00017.
Blay Jnr, A.V.K., Kukah, A.S.K., Opoku, A. and Asiedu, R., 2023. Impact of competitive strategies on achieving the sustainable development goals: context of Ghanaian construction firms. International Journal of Construction Management, [e-journal] 23(13), pp.2209-2220. 10.1080/15623599.2022.2048343.
Boadu, E.F., Sunindijo, R.Y. and Wang, C.C., 2021. Health and Safety Consideration in the Procurement of Public Construction Projects in Ghana. Buildings, [e-journal] 11(3), p.128. 10.3390/buildings11030128.
Boadu, E.F., Sunindijo, R.Y., Wang, C.C. and Frimpong, S., 2022. Client-led promotion of health and safety through the procurement process on public construction projects in developing countries. Safety Science, [e-journal] 147, p.105605. 10.1016/j.ssci.2021.105605.
Boote, D.D. and Beile, P., 2005. Scholars before researchers: on the centrality of the dissertation literature review in research preparation. Educational Researcher, [e-journal] 34 (5), pp.3-15. 10.3102/0013189X034006003.
British Standards Institution, 2022. What is a Management System? Available at: https://bsigroup.com/en-AU/About-BSI/FAQs/What-is-a-Management-System/ [Accessed 24 March, 2023].
Brown, T.A., 2015. Confirmatory factor analysis for applied research. 2nd ed. New York: The Guilford Press.
Bryman, A. 2009. Social Research Methods. 3rd ed. Oxford: Oxford University Press.
Byrne, B.M., 2010. Structural equation modelling with AMOS: basic concepts, applications, and programming. 2nd ed. New York: Francis and Taylor Group, LLC.
Camacho, F. and Cruz, C.O., 2022. Toll road sector in Brazil: regulation by contract and recent innovations. Competition and Regulation in Network Industries, [e-journal] 23(2), pp.135-152. 10.1177/17835917221087897.
Chigara, B. and Moyo, T., 2022. Factors affecting the delivery of optimum health and safety on construction projects during the covid-19 pandemic in Zimbabwe. Journal of Engineering, Design and Technology, [e-journal] 20(1), pp.24-46. 10.1108/JEDT-01-2021-0053.
Cohen, L., Manion, L. and Morrison, K., 2005. Research methods in education. 5th ed. New York: Francis and Taylor.
Creswell, J.W., 2014. Research design: qualitative, quantitative, and mixed approaches. 4th ed. Thousand Oaks: Sage Publications.
Creswell, J.W. and Plano Clark, V.L., 2018. Designing and conducting mixed methods research. 3rd ed. Thousand Oaks: Sage Publications.
Das, M. and Rangarajan, K., 2020. Impact of policy initiatives and collaborative synergy on sustainability and business growth of Indian SMEs. Indian Growth and Development Review, 13(3), pp.607-627. https://doi.org/10.1108/IGDR-09-2019-0095.
de Oliveira, R.A., Lopes, J. and Abreu, M.I., 2021. Insights from a project procurement strategy through an action research. Procedia Computer Science, [e-journal] 181, pp.1002-1010. 10.1016/j.procs.2021.01.275.
Dikmen, I., Atasoy, G., Erol, H., Kaya, H.D. and Birgonul, M.T. 2022. A decision-support tool for risk and complexity assessment and visualization in construction projects. Computers in Industry, [e-journal] 141, p.103694. 10.1016/j.compind.2022.103694.
Dimitriou, D. and Papakostas, K., 2022. Review of management comprehensiveness on occupational health and safety for PPP transportation projects. Sustainability, [e-journal] 14(10), p.6296. 10.3390/su14106296.
Do, S.T., Nguyen, V.T. and Dang, C.N., 2022. Exploring the relationship between failure factors and stakeholder coordination performance in high-rise building projects: empirical study in the finishing phase. Engineering, Construction and Architectural Management, [e-journal] 29(2), pp.870-895. 10.1108/ECAM-09-2020-0744.
Do, S.T., Nguyen, V.T. and Nguyen, N.H., 2022. Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management, [e-journal] Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-01-2022-0066
Donkoh, D. and Aboagye-Nimo, E., 2016. Stakeholders’ role in improving Ghana’s construction safety. Proceedings of the Institution of Civil Engineers-Management, Procurement and Law, [e-journal] 170(2), pp.68-76. 10.1680/jmapl.16.00019.
Durdyev, S., 2021. Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, [e-journal] 28(4), pp.1241-1260. 10.1108/ECAM-02-2020-0137
Ebekozien, A., 2022. Construction companies’ compliance to personal protective equipment on junior staff in Nigeria: issues and solutions. International journal of building pathology and adaptation, [e-journal] 40(4), pp.481-498. 10.1108/IJBPA-08-2020-0067.
Edmonds, W.A. and Kennedy, T.D., 2017. An applied guide to research designs: quantitative, qualitative, and mixed methods. 2nd ed. Thousand Oaks: Sage Publications.
Fareed, M.Z., Su, Q. and Awan, A.A., 2021. The effect of emotional intelligence, intellectual intelligence and transformational leadership on project success; an empirical study of public projects of Pakistan. Project Leadership and Society, [e-journal] 2, p.100036. 10.1016/j.plas.2021.100036.
Farouk Kineber, A., Othman, I.B., Oke, A. E. and Chileshe, N., 2022. Modelling the relationship between value management’s activities and critical success factors for sustainable buildings. Journal of Engineering, Design and Technology, [e-journal] 20(2), pp.414-435. 10.1108/JEDT-03-2021-0159.
Fashina, A.A., Omar, M.A., Sheikh, A.A. and Fakunle, F.F., 2021. Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, [e-journal] 7(4), 10.1016/j.heliyon.2021.e06826.
Field, A.P. 2005. Discovering statistics using SPSS. London: Sage Publications.
Fugar, F.D. and Agyakwah-Baah, A.B., 2010. Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, [e-journal] [e-journal] 10(1-2), pp.103-116. 10.5130/AJCEB.v10i1/2.1592.
Gadisa, B. and Zhou, H., 2021. Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, [e-journal] 28(6), pp.1683-1712. 10.1108/ECAM-12-2019-0689.
Gay, L.R., Mills, G.E. and Airasian, P. 2012. Educational research: competencies for analysis and application. 10th ed. New Jersey: Pearson.
Ghana Statistical Service. 2019. Rebased 2013-2019 Annual Gross Domestic Product. Ghana Statistical Services, Accra - Ghana. Available at:
Gheitarani, F., Nawaser, K., Hanifah, H. and Vafaei-Zadeh, A., 2023. Human-behavioural micro-foundations of dynamic capabilities: a systematic review of the last two decades of research. International Journal of Management and Decision Making, [e-journal] 22(1), pp.1-26. 10.1504/IJMDM.2023.127685.
Gurgun, A.P. and Koc, K., 2022. The role of contract incompleteness factors in project disputes: a hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, [e-journal] Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-11-2021-1020.
Hafner, T. 2018. Module 3.3 Weak regulatory systems. USAID and health finance and governance. Available at:
Hair, J.F., Black, W.C., Babin, B.J. and Anderson, R.E. 2010. Multivariate data analysis. 7th ed. New York: Pearson.
Hanneman, R.A., Kposowa, A.J. and Riddle, M.D., 2013. Basic Statistics for Social Research. San Francisco: John Willy and Sons, Inc.
Haron, N.A., Devi, P., Hassim, S., Alias, A.H., Tahir, M.M. and Harun, A.N., 2017. Project management practice and its effects on project success in Malaysian construction industry. IOP Conference Series: Materials Science and Engineering, [e-journal] 291 p.012008. 10.1088/1757-899X/291/1/012008.
Horvath, D. and Szabo, R.Z., 2019. Driving forces and barriers of industry 4.0: do multinational and small and medium-sized companies have equal opportunities? Technological Forecasting and Social Change, [e-journal] 146, pp.119-132. 10.1016/j.techfore.2019.05.021.
Hu, L.T., and Bentler, P.M., 1999. Cutoff criteria for fit indices in covariance structural analysis: conventional criteria versus new alternatives. Structural Equation Modelling, 6, pp.1-55.
Irfan, M., Khan, S.Z., Hassan,N., Hassan, M., Habib, M., Khan, S. and Khan, H.H., 2021. Role of project planning and project manager competencies on public sector project success. Sustainability, [e-journal] 13(3), p.1421. 10.3390/su13031421.
Jin, C., Tsai, F.S., Gu, Q. and Wu, B., 2022. Does the porter hypothesis work well in the emission trading schema pilot? Exploring moderating effects of institutional settings. Research in International Business and Finance, [e-journal] 62, p.101732. 10.1016/j.ribaf.2022.101732.
Johnson, R.B. and Christensen, L., 2014. Educational Research: Quantitative, Qualitative, and Mixed Approaches. 5th ed. Thousand Oaks: Sage Publications.
Kakar, A.S., Hasan, A., Jha, K.N. and Singh, A., 2022. Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, [e-journal] Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/JEDT-11-2021-0657.
Ketokivi, M. and Mantere, S., 2010. Two strategies for inductive reasoning in organizational research. Academy of Management Review, 35(2), pp.315-33.
Khan, R.A., Liew, M.S. and Ghazali, Z.B., 2014. Malaysian construction sector and Malaysia vision 2020: developed nation status. Procedia-social and behavioural sciences, [e-journal] 109, 507-513. 10.1016/j.sbspro.2013.12.498.
Kline, R. B. 2016. Principles and practice of structural equation modelling. New York: Guilford Press.
Kordi, N.E., Belayutham, S. and Che Ibrahim, C.K.I., 2021. Mapping of social sustainability attributes to stakeholders’ involvement in construction project life cycle. Construction Management and Economics, 39(6), pp.513-532. 10.1080/01446193.2021.1923767.
Laryea, S.2010. Challenges and Opportunities Facing Contractors in Ghana. In: Laryea, S., Leiringer, R. and Hughes, W., 2010 West Africa Built Environment Research Conference (WABER). Accra, Republic of Ghana, 27-28 July 2010. Accra: British Council.
Lee, H., Kim, D.Y., Shin, D., Oh, J. and Choi, H., 2022. Effect of foam conditioning on performance of EPB shield tunnelling through laboratory excavation test. Transportation Geotechnics, [e-journal] 32, p.100692. 10.1016/j.trgeo.2021.100692.
Love, P.E., Matthews, J., Ika, L.A., Teo, P., Fang, W. and Morrison, J., 2023. From Quality-I to Quality-II: cultivating an error culture to support lean thinking and rework mitigation in infrastructure projects. Production Planning and Control, [e-journal] 34(9), pp.812-829. 10.1080/09537287.2021.1964882.
Mangla, S.K., Luthra, S., Mishra, N., Singh, A., Rana, N.P., Dora, M. and Dwivedi, Y., 2018. Barriers to effective circular supply chain management in a developing country context. Production Planning and Control, [e-journal] 29(6), pp.551-569. 10.1080/09537287.2018.1449265.
Manoharan, K., Dissanayake, P.B., Pathirana, C., Deegahawature, D. and Silva, K.R.R., 2023. A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, [e-journal] 13(1), pp.36-55. 10.1108/BEPAM-10-2021-0125.
Maqbool, R. and Amaechi, I.E., 2022. A systematic managerial perspective on the environmentally sustainable construction practices of UK. Environmental Science and Pollution Research, [e-journal] 29(42), pp.64132-64149. 10.1007/s11356-022-20255-5.
Marsh, A.T., Velenturf, A.P. and Bernal, S.A., 2022. Circular economy strategies for concrete: implementation and integration. Journal of Cleaner Production, [e-journal] 362, p.132486. 10.1016/j.jclepro.2022.132486.
Moyo, T., and Chigara, B., 2022. Causes of cost overruns on Zimbabwe’s construction infrastructure projects. Journal of Construction Project Management and Innovation, [e-journal] 12(1), pp.65-86. 10.36615/jcpmi.v12i1.1223.
Naji, K.K., Gunduz, M. and Falamarzi, M.H., 2022. Assessment of construction project contractor selection success factors considering their interconnections. KSCE Journal of Civil Engineering, [e-journal] 26(9), pp.3677-3690. 10.1007/s12205-022-1377-6.
Nanually, J.C., and Bernstein, I.H., 1994. The assessment of reliability. Psychometric Theory, 3, pp.248-292.
Newman, W.L. 2014. Social research methods: qualitative and quantitative approaches. 7th ed. Edinburgh: Pearson Education Limited.
Ngacho, C. and Das, D., 2015. A performance evaluation framework of construction projects: insights from literature. International Journal of Project Organisation and Management, [e-journal] 7(2), pp.151-173. 10.1504/IJPOM.2015.069616.
Nguyen, V.T. and Do, S.T., 2023. Assessing the relationship chain among causes of variation orders, project performance, and stakeholder performance in construction projects. International Journal of Construction Management, [e-journal] 23(9), pp.1592-1602. 10.1080/15623599.2021.1988197.
Noruwa, B.I., Arewa, A.O. and Merschbrock, C., 2022. Effects of emerging technologies in minimising variations in construction projects in the UK. International Journal of Construction Management, [e-journal] 22(11), pp.2199-2206. 10.1080/15623599.2020.1772530.
Ofori-Kuragu, J.K. 2014. Enabling world-class performance in Ghanaian contractors – framework for bench marking. Ph. D. Kwame Nkrumah University of Science and Technology, Ghana.
Ogogo, D.O., Omwenga, J.Q. and Paul, S.N., 2019. Influence of the moderating effect of government regulations on performance of government construction projects in Kenya. The International Journal of Humanities and Social Studies, [e-journal] 7(4), pp.78-81. 10.24940/theijhss/2019/v7/i4/HS1904-039.
Ogunnusi, M., Omotayo, T., Hamma-Adama, M., Awuzie, B. O. and Egbelakin, T., 2021. Lessons learned from the impact of COVID-19 on the global construction industry. Journal of Engineering, Design and Technology, [e-journal] 20(1), pp.299-320. 10.1108/JEDT-05-2021-0286.
Olanrewaju, O.I., Kineber, A.F., Chileshe, N. and Edwards, D.J., 2021. Modelling the impact of building information modelling (BIM) implementation drivers and awareness on project lifecycle. Sustainability, [e-journal] 13(16), p.8887. 10.3390/su13168887.
Osei-Asibey, D., Ayarkwa, J., Acheampong, A., Adinyira, E. and Amoah, P., 2021. Framework for improving construction health and safety on Ghanaian construction sites. Journal of Building Construction and Planning Research, [e-journal] 9, pp.115-137. 10.4236/jbcpr.2021.92009.
Osei-Tutu, E., Offei-Nyako, K., Ameyaw, C. and Ampofo, K.T., 2010. Conflict of interest and related corrupt practices in public procurement in Ghana. International Journal of Civil Engineering Construction and Estate Management, 1(2), pp.1-15.
Othman, I., Kineber, A.F., Oke, A.E., Zayed, T. and Buniya, M.K., 2021. Barriers of value management implementation for building projects in Egyptian construction industry. Ain Shams Engineering Journal, [e-journal] 12(1), pp.21-30. 10.1016/j.asej.2020.08.004.
Pamidimukkala, A. and Kermanshachi, S., 2021. Impact of Covid-19 on field and office workforce in construction industry. Project Leadership and Society, [e-journal] 2, p.100018. 10.1016/j.plas.2021.100018.
Parchami Jalal, M., Noorzai, E. and Yavari Roushan, T., 2019. Root cause analysis of the most frequent claims in the building industry through the SCoP3E Ishikawa diagram. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, [e-journal] 11(2), p.04519004. 10.1061/(ASCE)LA.1943-4170.0000289.
Patel, V., Chesmore, A., Legner, C.M. and Pandey, S., 2022. Trends in workplace wearable technologies and connected‐worker solutions for next‐generation occupational safety, health, and productivity. Advanced Intelligent Systems, [e-journal] 4(1), p.2100099. 10.1002/aisy.202100099.
Peprah, C., 2016. Challenges SMEs face in acquiring loans from banks: a comparative study between Finland and Ghana. Centria University of Applied Sciences.
Prakash, S., 2021. Impact of Climate change on Aquatic Ecosystem and its Biodiversity: An overview. International Journal of Biological Innovations, [e-journal] 3(2). pp.312-317. 10.46505/IJBI.2021.3210.
Qureshi, A.H., Alaloul, W.S., Wing, W.K., Saad, S., Ammad, S. and Altaf, M., 2023. Characteristics-based framework of effective automated monitoring parameters in construction projects. Arabian Journal for Science and Engineering, [e-journal] 48(4), pp.4731-4749. 10.1007/s13369-022-07172-y.
Rasul, N., Malik, M.S.A., Bakhtawar, B. and Thaheem, M.J., 2021. Risk assessment of fast-track projects: a systems-based approach. International Journal of Construction Management, [e-journal] 21(11), pp.1099-1114. 10.1080/15623599.2019.1602587.
Raza, M.S., Tayeh, B.A. and Ali, T.H., 2022. Owner’s obligations in promoting occupational health and safety in preconstruction of projects: a literature viewpoint. Results in Engineering, [e-journal] 16, p.100779. 10.1016/j.rineng.2022.100779.
Sahu, A.K., Sharma, M., Raut, R.D., Sahu, A.K., Sahu, N.K., Antony, J. and Tortorella, G.L., 2023. Decision-making framework for supplier selection using an integrated MCDM approach in a lean-agile-resilient-green environment: evidence from Indian automotive sector. The TQM Journal, [e-journal] 35(4), pp.964-1006. 10.1108/TQM-12-2021-0372.
Saunders, M.N.K., P. Lewis, and A. Thornhill. 2019. Research methods for business students. 8th ed. Harlow: Pearson Education Limited.
Schumacker, R.E., and R.G. Lomax. 2010. A beginner’s guide to structural equation modelling. 3rd ed. New York: Taylor and Francis Group.
Sen, S., Kotlarsky, J. and Budhwar, P., 2020). Extending organizational boundaries through outsourcing: toward a dynamic risk-management capability framework. Academy of Management Perspectives, [e-journal] 34(1), pp.97-113. 10.5465/amp.2015.0191.
Siriwardhana, S.D., Kulatunga, U., Samaraweera, A. and Shanika, V.G., 2021. Cultural issues of community resettlement in post-disaster reconstruction projects in Sri Lanka. International Journal of Disaster Risk Reduction, [e-journal] 53, 102017. 10.1016/j.ijdrr.2020.102017.
Stasiak-Betlejewska, R. and Potkany, M., 2015. Construction costs analysis and its importance to the economy. Procedia Economics and Finance, [e-journal] 34, pp.35-42. 10.1016/S2212-5671(15)01598-1.
Suwal, S., Laukkanen, M., Javaja, P., Hakkinen, T. and Kubicki, S., 2019. BIM and Energy Efficiency training requirement for the construction industry. Earth and Environmental Science, [e-journal] 297(1), p.012037. 10.1088/1755-1315/297/1/012037.
Tan-Mullins, M. and Mohan, G., 2013. The potential of corporate environmental responsibility of Chinese state-owned enterprises in Africa. Environment, Development and Sustainability, [e-journal] 15, pp.265-284. 10.1007/s10668-012-9409-x.
Tariq, J. and Gardezi, S.S.S., 2023. Study the delays and conflicts for construction projects and their mutual relationship: a review. Ain Shams Engineering Journal, [e-journal] 14(1), p.101815. 10.1016/j.asej.2022.101815.
Tijani, B., Jin, X. and Osei-Kyei, R., 2021. A systematic review of mental stressors in the construction industry. International Journal of Building Pathology and Adaptation, [e-journal] 39(2), pp.433-460. 10.1108/IJBPA-02-2020-0011.
Tripathi, O.P., Hasan, A., Jha, K.N. and Jain, A.K., 2023. evaluating government contracts for delays, delay damages, and levy of compensation provisions. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, [e-journal] 15(1), p.04522032. 10.1061/(ASCE)LA.1943-4170.0000584.
Unegbu, H.C.O., Yawas, D.S. and Dan-Asabe, B., 2022. An investigation of the relationship between project performance measures and project management practices of construction projects for the construction industry in Nigeria. Journal of King Saud University-Engineering Sciences, [e-journal] 34(4), pp.240-249. 10.1016/j.jksues.2020.10.001.
Vahabi, A., Nasirzadeh, F. and Mills, A., 2022. Impact of project briefing clarity on construction project performance. International Journal of Construction Management, [e-journal] 22(13), pp.2504-2516. 10.1080/15623599.2020.1802681.
Vanderstoep, S.W. and Johnston, D.D., 2009. Research methods for everyday life: blending qualitative and quantitative approaches. San Francisco: Jossey-Bass.
Vulink, M. 2004. Technology Transfer in the Construction Industry of Ghana. Master Thesis. Technical University of Eindhoven.
Watkins, M.W., 2018. Exploratory factor analysis: a guide to best practice. Journal of Black Psychology, [e-journal] 44(3), pp.219-246. 10.1177/009579841877180.
Wu, S., Hou, L., Zhang, G.K. and Chen, H., 2022. Real-time mixed reality-based visual warning for construction workforce safety. Automation in Construction, [e-journal] 139, p.104252. 10.1016/j.autcon.2022.104252.
Yada, A.L. and Yadeta, F.T., 2016. Factors affecting the performance of construction project under Oromia industry and Urban Development Bureau, Ethiopia. ABC Research Alert, [e-journal] 4(2). https://doi.org/10.18034/abcra.v4i2.303.
Yang, R., Huang, J. and Griffiths, D.V., 2022. Optimal geotechnical site investigations for slope reliability assessment considering measurement errors. Engineering Geology, [e-journal] 297, p.106497. 10.1016/j.enggeo.2021.106497.
Yap, J.B.H., Goay, P.L., Woon, Y.B. and Skitmore, M., 2021. Revisiting critical delay factors for construction: analysing projects in Malaysia. Alexandria Engineering Journal, [e-journal] 60(1), pp.1717-1729. 10.1016/j.aej.2020.11.021.
Yap, J. B. H., Lim, B. L., Skitmore, M. and Gray, J., 2022. Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, [e-journal] 20(3), pp.800-822. 10.1108/JEDT-10-2020-0413.
Yuan, M., Li, Z., Li, X. and Luo, X. (2021). Managing stakeholder-associated risks and their interactions in the life cycle of prefabricated building projects: a social network analysis approach. Journal of Cleaner Production, [e-journal] 323, p.129102. 10.1016/j.jclepro.2021.129102.
Zulu, E., Zulu, S., Chabala, M., Musonda, I., Kavishe, N. and Chileshe, N., 2022. Challenges and advocated solutions for environmental protection legislation for building infrastructure projects in developing countries: evidence from Zambia. Project Leadership and Society, [e-journal] 3, p.100056. 10.1016/j.plas.2022.100056.