Non-toll revenue potential to increase funding sources for toll road maintenance

Main Article Content

Betty Susanti
Edi Kadarsa
Mona Foralisa
Ika Juliantina

Abstract

The purpose of providing toll road infrastructure through Public-Private Partnerships (PPP) is to ensure that the private sector generates sufficient revenue to manage road operations and maintenance effectively. However, in many countries, various practices of PPP have led to budget shortfalls for road operations and maintenance. This situation is often due to escalating construction costs and lower-than-expected traffic volumes. To address these financial challenges, this study aimed to implement asset commercialization schemes within toll road management. A specific case study was conducted on a section of the Indonesian Trans Sumatra toll road that faced rising construction costs and low traffic volumes. A quantitative approach was applied to assess potential non-toll revenue that could be generated through asset commercialization along toll road corridors. The commercialization opportunities considered included leasing land for advertisements, installing solar power plants, erecting communication towers, and establishing rest area businesses. The identification and analysis of these opportunities were closely tied to the type, quantity, and location of asset. The results showed that asset commercialization schemes, particularly land leases for advertisements and rest area businesses, had potential to generate substantial revenue. It showed that by fully capitalizing on asset commercialization opportunities along toll road corridors, significant additional income could be generated to support road maintenance funding. The approach developed in this study could be applied to other toll road sections facing revenue deficits and budgetary challenges in maintaining their operations. This study could contribute to the growing body of knowledge on the commercialization of toll road asset.

Article Details

How to Cite
Susanti, B., Kadarsa, E., Foralisa, M., & Juliantina, I. (2023). Non-toll revenue potential to increase funding sources for toll road maintenance. Construction Economics and Building, 23(3/4). https://doi.org/10.5130/AJCEB.v23i3/4.8876
Section
Articles (Peer reviewed)

References

Bayraktar, M. E., Arif, F., Ponder, D., Prozzi, J. and Mahmoud, N. V., 2016. Opportunities for value extraction projects in highway rights-of-way and development of feasibility assessment tool. Journal of Construction Engineering and Management, 142(8), 1-13. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001080
Blank, L. and Tarquin, A., 2012. Engoneering Economy. New York: Mc-Graw Hill.
Castelblanco, G., Guevara, J., Mesa, H. and Hartmann, A., 2022. Social legitimacy challenges in toll road PPP programs: Analysis of the Colombian and Chilean cases. Journal of Management in Engineering, 38(3), 1-15. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001010
Chen, J., Yu, J., Shen, Z., Song, M. and Zhou, Z., 2023. Debt financing and maintenance expenditure: Theory and evidence on government-operated toll roads in China. Economic Systems, 47(1), 1-17. https://doi.org/10.1016/j.ecosys.2022.101049
Cherkos, F. D. and Jha, K. N., 2020. Enabling successful application of PPPs in new (inexperienced) markets: Implications of PPPs’ success and failure in toll roads. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(4), 1-13. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000434
Chung, J. H., 2020. Debt/equity tradeoff model for revenue based DBFOM PPP transportation infrastructure: Case study of I-95 (VA) Express Lanes. Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts (pp. 1177-1185). Tempe, Arizona: American Society of Civil Engineers (ASCE).
Czajkowski, M., Bylicki, M., Budziński, W. and Buczyński, M., 2022. Valuing externalities of outdoor advertising in an urban setting – the case. Journal of Urban Economics, 130, 1-14. https://doi.org/10.1016/j.jue.2022.103452
de Albornoz, V. A., Soliño, A. S., Galera, A. L. and Álvarez, J. M., 2021. Bankrupt PPPs: Is it really so bad? Case study of R-3 and R-5 toll motorways in Spain. Transport Policy, 114, 78-87. https://doi.org/10.1016/j.tranpol.2021.09.007
Endo, K., Gianoli, A. and Edelenbos, J., 2020. Coming to financial close in PPPs: Identifying critical factors in the case of toll road projects in Indonesia. Public Works Management and Policy, 26(2), 1-29. https://doi.org/10.1177/1087724X20914627
Faroqi, H., Mesbah, M. and Kim, J., 2019. Behavioural advertising in the public transit network. Research in Transportation Business and Management, 32, 1-9. https://doi.org/10.1016/j.rtbm.2019.100421
Feng, K., Wang, S., Wu, C., Xia, G. and Hu, W., 2019. Optimization of concession period for Public Private Partnership toll roads. Inzinerine Ekonomika-Engineering Economics, 30(1), 24-31. https://doi.org/10.5755/j01.ee.30.1.19215
He , Y., Shi, L., & Li, Z. (2022). Early termination mechanism of Public–Private Partnership transportation projects with government guarantee. Journal of Infrastructure Systems, 28(4). https://doi.org/10.1061/(ASCE)IS.1943-555X.0000720
Hinton, J., Watson, B. and Oviedo-Trespalacios, O., 2022. A novel conceptual framework investigating the relationship between roadside advertising and road safety: The driver behaviour and roadside advertising conceptual framework. Transportation Research Part F: Traffic Psychology and Behaviour, 85, 221-235. https://doi.org/10.1016/j.trf.2021.12.002
Hoeflich, K. and Witt, K., 2019. The evolution of non-toll revenue sources . Kansas City, Missouri: HNTB.
Jammalamadaka, P., Jarmarwala, Y., Zhou, L., Mokkapati, N. and Hirunyanitiwattana, W., 2017. Evaluation of traffic and revenue risks of toll roads and managed lane facilities. Advances in Public-Private Partnerships (pp. 460-472). Austin, Texas: American Society of Civil Engineers.
Jin, H., Liu, S., Li, J. and Liu, C., 2020. Imperfect information bargaining model for determining concession period of PPPs under revenue uncertainty. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(2), 1-10. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000382
Jin, H., Liu, S., Liu, C. and Udawatta, N., 2019. Optimizing the concession period of PPP projects for fair allocation of financial risk. Engineering, Construction and Architectural Management, 26(10). 2347-2363. https://doi.org/10.1108/ECAM-05-2018-0201
Jin, H., Liu, S., Sun, J. and Liu, C., 2021. Determining concession periods and minimum revenue guarantees in public-private-partnership agreements. European Journal of Operational Research, 291(2), 512-524. https://doi.org/10.1016/j.ejor.2019.12.013
Jin, L., Zhang, Z. and Song, J., 2020. Profit allocation and subsidy mechanism for Public–Private Partnership toll road projects. Journal of Management in Engineering, 36(3), 1-10. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000766
Li, X. and Love, P. E., 2019. Employing land value capture in urban rail transit Public Private Partnerships: Retrospective analysis of Delhi's airport metro express. Research in Transportation Business and Management, 32, 1-13. https://doi.org/10.1016/j.rtbm.2020.100431
Litman, T., 2022. Local Funding Options for Public Transportation. Victoria, Canada: Victoria Transport Policy Institute.
Liu, H., Song, S., Hu, Y. and Yan, X., 2020. Monte-Carlo optimization model for dynamic capital structure adjustment in Chinese Public-Private Partnerships under revenue uncertainty. Transportation Research Part A: Policy and Practice, 142, 115-128. https://doi.org/10.1016/j.tra.2020.10.010
Lu, Z. and Meng, Q., 2023. Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts. Transportation Research Part B: Methodological, 172, 71-92. https://doi.org/10.1016/j.trb.2023.03.011
Lv, J., Lin, M., Zhou, W. and Xu, M., 2021. How PPP renegotiation behaviors evolve with traffic changes: Evolutionary game approach. Journal of Construction Engineering and Management, 147(5), https://doi.org/10.1061/(ASCE)CO.1943-7862.0002024
Małecki, K., Jankowski, J. and Szkwarkowski, M., 2019. Modelling the impact of transit media on information spreading in an urban space using cellular automata. Symmetry, 11(3), 1-21. https://doi.org/10.3390/sym11030428
Mendelsohn, P., 2015. Review of Roadside Advertising. Glasgow: Scottish Roads Research Board.
Pellegrino, R., 2021. Effects of public supports for mitigating revenue risk in Public–Private Partnership projects: model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), 248–261. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002098
Perkasa, A. R., Utomo, C. and Santoso, E. B., 2023. A review of research methods on highest and best use for toll rest area. Materials Today, 85, 19-23. https://doi.org/10.1016/j.matpr.2023.05.247
PT. Jasa Marga (Persero). (2019). Annual Report. Jakarta: PT. Jasa Marga (Persero).
Shi, S., An, Q. and Chen, K., 2020. Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee. Transportation Research Part A: Policy and Practice, 139, 228-254. https://doi.org/10.1016/j.tra.2020.06.023
Sihombing, L. B., 2017. Project finance and risk modelling using a system dynamic approach: a toll road project. Malaysian Journal of Industrial Technology, 2(2), 86-93.
Silverberg, B. R. (1998). Transit Advertising Revenue: Traditional and New Sources and Structures. Washington, D.C: National Academy Press.
Simatupang, S., Ulinata, U. and Diyanti, G., 2021. Questioning the common of the street in relation to outdoor advertisements in it. IOP Conf. Series: Earth and Environmental Science. 878, pp. 1-7. Jakarta: IOP Publishing. doi:10.1088/1755-1315/878/1/012015
Solak, A. O., 2022. Toll roads in Turkey: Private versus public. Case Studies in Transport Policies, 10(2), 1110-1117. https://doi.org/10.1016/j.cstp.2022.03.019
Tsamboulas, D., Evgenikos, P. and Strogyloudis, M.A., 2006. The financial viability of motorway rest areas. Public Works Management and Policy, 11(1), 63-77. https://doi.org/10.1177/1087724X062923
Wang, H., Liu, Y., Xiong, W. and Zhu, D., 2019. Government support programs and private investments in PPP markets. International Public Management Journal, 22(3), 499-523. doi: 10.1080/10967494.2018.1538025
Wraharjo, M., Susanti, B. and Kadarsa, E., 2022. Financial feasibility analysis of cost and traffic volume: Case study on toll road investment project. Engineering and Applied Science Research , 49(3), 308-315. doi: 10.14456/easr.2022.32
Xuto, P., Anderson, R. J., Graham, D. J. and Hörcher, D., 2023. Sustainable urban rail funding: Insights from a century-long global dataset. Transport Policy, 130, 100-115. https://doi.org/10.1016/j.tranpol.2022.10.005
Zhang, S., Li, J., Li, Y. and Zhang, X., 2021. Revenue risk allocation mechanism in Public-Private Partnership projects: Swing option approach. Journal of Construction Engineering and Management, 147(1), 1-14. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001952