Analyzing the Influence of Organizational Culture in Projects using Last Planner System

Main Article Content

Jugal Pancholi
Dr. Ganesh Devkar

Abstract

The use of lean tools and techniques to reduce waste from the workflow has been prominently gaining popularity in the construction industry worldwide. Last Planner System (LPS) is one of such distinguished tools used by construction majors. Many research suggests that LPS plays a significant role in improving the collaboration among the project team members and the firm's organizational culture. This paper reports the intermediating effect of organizational culture on construction projects that implement the Last Planner System and also identifies the effect of LPS on the project's operational performance. Various survey items pertaining to each variable was identified and was validated through Content Validation. All the established items were then compiled into a questionnaire, and multiple data were collected from a variety of projects. The data were analyzed using bivariate correlation and multiple regression analysis. Additionally, the "organizational culture assessment instrument" was utilized to compare the organizational cultures of various construction sites. It was discovered that the Last Planner System had a positive but negligible relationship with the operational performance of the project, and the organizational culture. It was observed that all the projects implementing LPS had a balance culture. The contribution of this work is the knowledge that the implementation of the Last Planner System is not necessarily enhanced by culture to a great extent. However, it has a positive impact on both the operational performance of the project and the organizational culture.

Article Details

How to Cite
Pancholi, J., & Devkar, G. (2023). Analyzing the Influence of Organizational Culture in Projects using Last Planner System. Construction Economics and Building, 23(3/4). https://doi.org/10.5130/AJCEB.v23i3/4.8804
Section
Articles (Peer reviewed)

References

Ahiakwo, O., Oloke, D., Suresh, S., & Khatib, J. (2013). A Case Study of Last Planner System Implementation in Nigeria. International Group for Lean Construction, 44(0), 699–707.
Al-Omiri, M., & Drury, C. (2007). A survey of factors influencing the choice of product costing systems in UK organizations. Management Accounting Research, 18(4), 399–424. https://doi.org/10.1016/j.mar.2007.02.002
Alsehaimi, A., Tzortzopoulos, P., & Koskela, L. (2009). Last Planner System: Experiences from Pilot Implementation in The Middle East. International Group for Lean Construction, 53–66.
Amos, D., & Boakye-agyeman, N. A. (2022). Content validation of value-adding indicators for corporate real estate management : insights from a developing country. Journal of Engineering, Design and Technology. https://doi.org/10.1108/JCRE-08-2021-0024
Ballard, G. (2000). The Last Planner System of Production Control (Issue May). University of Birmingham.
Ballard, G. (1997). Lookahead Planning: The Missing Link in Production Control. International Group for Lean Construction, 13–26.
Ballard, G., & Howell, G. (2004). An update on last planner. International Group for Lean Construction, 13.
Ballard, G., & Tommelein, I. (2016). Current Process Benchmark for the Last Planner ® System Planner System. Lean Construction Institute, 89, 57–89.
Bhatla, A., & Leite, F. (2004). Integration Framework of BIM with the Last Planner System. International Group for Lean Construction, 10.
Bortolazza, R. C., & Formoso, C. T. (2006). A Quantitative Analysis of Data Collected from The Last Planner System in Brazil. International Group for Lean Construction, 625–635.
Cameron, K., & Quinn, R. (2006). Diagnosing and Changing Organizational Culture.
Castillo, T., Alarc, L. F., Asce, A. M., & Salvatierra, J. L. (2018). Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects. American Society of Civil Engineers, 144(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001443
Daniel, Emmanuel I, Pasquire, C., & Dickens, G. (2015). Exploring The Implementation Of The Last Planner System Through IGLC Community : Twenty One Years Of Experience. International Group for Lean Construction, 153–162.
Daniel, Emmanuel Itodo, Pasquire, C., & Dickens, G. (2019). Development of Approach to Support Construction Stakeholders in Implementation of the Last Planner System. American Society of Civil Engineers, 35(5), 1–16. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000699
Fadnavis, S., Najarzadeh, A., & Badurdeen, F. (2020). ScienceDirect An Assessment of Organizational Culture Traits Impacting Problem Solving An Assessment of Organizational Traits Impacting Problem Solving for Lean Culture Transformation for Lean Transformation. Procedia Manufacturing, 48, 31–42. https://doi.org/10.1016/j.promfg.2020.05.017
Fernandez-solis, J. L., Porwal, V., Lavy, S., Shafaat, A., Rybkowski, Z. K., do Nascimento, A. F., & Lagoo, N. (2013). Survey of Motivations , Benefits , and Implementation Challenges of Last Planner System Users. American Society of Civil Engineers, 139(April), 354–360. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000606
Flyvbjerg, B. (2006). Five Misunderstandings About Case-Study Research. Qualitative Inquiry, 12(2), 219–245.
Formoso, C. T., & Moura, C. B. (2009). Evaluation Of the Impact of The Last Planner System on The Performance of Construction Projects. International Group for Lean Construction, 153–164.
Hackett, V., Harte, P., & Chendo, J. (2019). The Development and Use of Last Planner System (LPS) Guidance. International Group for Lean Construction, 651–662.
Hamzeh, & Aridi, O. Z. (2020). Modeling the last planner system metrics : A case study of an AEC. International Group for Lean Construction, 599–608.
Hamzeh, Khalife, S., Samad, G. El, Rizk, L., Abou-, H., Hattab, M. Al, & Emdanat, S. (2020). Advanced LPS Metrics for Construction Planning and Control (Issue Ballard 2000).
Hamzeh, Tommelein, I., & Ballard, G. (2015). Understanding the Role of " Tasks Anticipated " in Lookahead Planning through Simulation. Automation in Construction, Elsevier, January, 19. https://doi.org/10.1016/j.autcon.2014.09.005
Hardcopf, R., Jason, G., & Shah, R. (2021). Lean and Performance : The Impact of Organizational Culture International Journal of Production Economics Lean production and operational performance : The influence of organizational culture. International Journal of Production Economics, March, 108060. https://doi.org/10.1016/j.ijpe.2021.108060
Hofstede, G. (2011). Dimensionalizing Cultures : The Hofstede Model in Context Dimensionalizing Cultures : The Hofstede Model in Context. 2, 1–26.
Howell, Greg, & Ballard, G. (1997). What is Lean Construction ? International Group for Lean Construction, July, 3–4.
Howell, Gregory. (1999). What Is Lean Construction - 1999. International Group for Lean Construction, 1–10.
International Project Management Association. (2018). Individual Competence Baseline for Project Management.
Johansen, & Porter, G. (2000). An Experience of Introducing Last Planner into A UK Construction Project. International Group for Lean Construction, 11.
Jose, F.-S., Vishal, P., Sarel, L., Ali, S., K., R. Z., Kiyoung, S., & Nishi, L. (2013). Survey of Motivations, Benefits, and Implementation Challenges of Last Planner System Users. Journal of Construction Engineering and Management, 139(4), 354–360. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000606
Kallassy, J., & Hamzeh, F. (2021). Developing A Lean Culture Index in Construction. International Group for Lean Construction, 504–513. https://doi.org/doi.org/10.24928/2021/0192
Koskela, L., Ballard, G., Howell, G., & Tommelein, I. (2002). The foundations of lean construction. Design and Construction: Building in Value.
Koskela, L., Stratton, R., & Koskenvesa, A. (2010). Last Planner and Critical Chain in Construction Management. July, 538–547.
LCI. (2019). What is Lean ? 29.
Lühr, G., & Bosch-rekveldt, M. (2019). Measuring Project’s Team Culture in Projects Using the Last Planner System. July. https://doi.org/10.24928/2019/0124
Lühr, G., & Bosch-rekveldt, M. (2021). The Last-Planner-System ’ s impact on project culture. September. https://doi.org/10.1108/JEDT-05-2021-0285
Lühr, G. J., Bosch-Rekveldt, M., & Radujković, M. (2021). The Last-Planner-System’s impact on project culture. Journal of Engineering, Design and Technology, ahead-of-print(ahead-of-print). https://doi.org/10.1108/JEDT-05-2021-0285
Mossman, A. (2015). Last Planner -5 + 1 crucial & collaborative conversations for predictable design & construction delivery. The Change Business, December, 37.
Porwal, V., Lavy, S., & Rybkowski, Z. K. (2010). Last Planner System Implementation Challenges. International Group for Lean Construction, July, 548–556.
Potter, A. (2022). Exploring the role of lean managers within the Toyota supply network: evidence from a social media platform. Production Planning and Control, 33(8), 723–740. https://doi.org/10.1080/09537287.2020.1831643
Priven, V., & Sacks, R. (2013). Social Network Development in Last Planner System TM Implementations. International Group for Lean Construction, 537–548.
Ravi, R., Fosse, R., Vaidyanathan, K., & Svalestuen, F. (2018). The Last Planner System: Comparing Indian and Norwegian Approaches. International Group for Lean Construction, 381–391.
Saiful, M., & Yusoff, B. (2019). ABC of Content Validation and Content Validity Index Calculation. Education in Medicine Journal, 11(2), 49–54. https://doi.org/10.21315/eimj2019.11.2.6
Samad, G. El, Hamzeh, F. R., & Emdanat, S. (2017). Last Planner System – The Need for New Metrics. International Group for Lean Construction, II(July), 637–644.
Samarrokhi, A., Jenab, K., & Weinsier, P. D. (2015). MS in Industrial Education (1979) and EdD in Vocational/Technical Education (1990) from Clemson University. He is currently the Editor of the. In International Journal of Modern Engineering and the International Journal of Engineering Research and Innovation and Editor (Vol. 21, Issue 1).
Seppänen, O., Modrich, R., & Ballard, G. (2015). Integration Of Last Planner System and Location-Based Management System. International Group for Lean Construction, 123–132.
Tayeh, B., Al-hallaq, K., Zahoor, H., & Khan, A. (2018). Techniques and benefits of implementing last planner system in the Gaza Strip construction industry. December. https://doi.org/10.1108/ECAM-01-2018-0039
Vaidyanathan, K., Vasipalli, P., & Singh, S. C. (2018). Building A Lean Culture into An Organization. International Group for Lean Construction, July. https://doi.org/10.24928/2018/0439