Perspectives on Modelling BIM-enabled Estimating Practices
Main Article Content
Abstract
BIM-enabled estimating processes do not replace or provide a substitute for the traditional approaches used in the architecture, engineering and construction industries. This paper explores the impact of BIM on these traditional processes. It identifies differences between the approaches used with BIM and other conventional methods, and between the various construction professionals that prepare estimates. We interviewed 17 construction professionals from client organizations, contracting organizations, consulting practices and specialist-project firms. Our analyses highlight several logical relationships between estimating processes and BIM attributes. Estimators need to respond to the challenges BIM poses to traditional estimating practices. BIM-enabled estimating circumvents long-established conventions and traditional approaches, and focuses on data management. Consideration needs to be given to the model data required for estimating, to the means by which these data may be harnessed when exported, to the means by which the integrity of model data are protected, to the creation and management of tools that work effectively and efficiently in multi-disciplinary settings, and to approaches that narrow the gap between virtual reality and actual reality. Areas for future research are also identified in the paper.
Article Details
This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors who publish with this journal agree to the following terms:
a) Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share and adapt the work with an acknowledgement of the work's authorship and initial publication in this journal.
b) Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
c) Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Open Access Citation Advantage Service). Where authors include such a work in an institutional repository or on their website (ie. a copy of a work which has been published in a UTS ePRESS journal, or a pre-print or post-print version of that work), we request that they include a statement that acknowledges the UTS ePRESS publication including the name of the journal, the volume number and a web-link to the journal item.
d) Authors should be aware that the Creative Commons Attribution (CC-BY) License permits readers to share (copy and redistribute the work in any medium or format) and adapt (remix, transform, and build upon the work) for any purpose, even commercially, provided they also give appropriate credit to the work, provide a link to the license, and indicate if changes were made. They may do these things in any reasonable manner, but not in any way that suggests you or your publisher endorses their use.
References
Acharya, N. K., Lee, Y. D., & Im, H. M. (2006). Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), 543-566.
Aje, I. O. (2012). The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(2), 159-172.
Akintoye, A., & Fitzgerald, E. (2000). A survey of current cost estimating practices in the UK. Construction Management and Economics, 18, 161-172.
Amor, R., & Faraj, I. (2001). Misconceptions about integrated project databases. Journal of Information Technology in Construction (ITcon), 6(5), 57-68.
Amor, R., Jiang, Y., & Chen, X. (2007). BIM in 2007 – are we there yet? Paper presented at the CIB International Conference on applications of IT in Construction (CIB-W78), Auchland, New Zealand.
Aranda-Mena, G., Crawford, J., Chevez, A., & Froese, T. (2009). Building information modelling demystified: does it make business sense to adopt BIM? International Journal of Managing Projects in Business, 2(3), 419-434.
Aranda-Mena, G., Succar, B., Chevez, A., Crawford, J., & Wakefield, R. (2008). BIM National guidelines and case studies (pp. 1-122). Melbourne, Australia: Cooperative Research Centres (CRC) for Construction Innovation.
Ashley, D. B., & Teicholz, P. M. (1977). Pre-Estimate Cash Flow Analysis. Journal of the Construction Division, 103(3), 369-379.
Ashworth, A. (2010). Cost Studies of Building (5th ed.). Harlow, UK: Pearson Prentice Hall.
Ashworth, A., & Hogg, K. (2007). Willis's Practice and Procedure for the Quantity Surveyor (12th ed.). Oxford, UK: Wiley-Blackwell.
Bailey, C. (2010). The Development of BIM-5D Estimating Capability. Retrieved 31st July, 2011, from http://www.ricsamericas.org/files/editor/Development_of_5D_Estimating_Paper_4.pdf
Best, R., de Valence, G., Langston, C., & Smith, P. (1996). Information Technology and evolution of Quantity Surveying profession - future direction. Paper presented at the International Construction Information Technology Conference INCIT 96 Proceedings: Bridging the Gap, Sydney, N.S.W.
Broekmaat, M. (2008). The 5D BIM Connection to Estimating Retrieved July 6, 2010, 2010, from http://www.vicosoftware.com/blogs/vicos_flying_dutchman/tabid/47083/bid/4451/The-5D-BIM-Connection-to-Estimating.aspx
Brook, M. (2004). Estimating and Tendering. Oxford, UK: Elsevier Butterworth-Heinermann.
Brook, M. (2008). Estimating and Tendering for construction works (Fourth ed.). Oxford: Elsevier Science and Technology, UK.
Cartlidge, D. (2010). Quantity Surveyor’s Pocket Book (Reprinted First Edition ed.). Oxford: Kidlington: Butterworth-Heinemann.
Chou, J.-S. (2011). Cost simulation in an item-based project involving construction engineering and management. International Journal of Project Management, 29(6), 706-717.
Collier, K. (1974). Fundamentals of construction estimating and cost accounting: Prentice-Hall.
Dean, R. P., & McClendon, S. (2007). Specifying and Cost Estimating with BIM. Retrieved 12th August, 2008), from http://www.architechmag.com/articles/detail.aspx?contentID=3624
Eastman, C., Liston, K., Sacks, R., & Teicholz, P. (2011). A BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. (2nd ed.). New York, NY: Wiley.
Geiger, T. S., & Dilts, D. M. (1996). Automated design-to-cost: integrating costing into the design decision. Computer-Aided Design, 28(6-7), 423-438.
Gerrard, A. M. (2000). Guide to capital cost estimating (Fourth Edition ed.). Warwickshire, UK: Institute of Chemical Engineers (IChemE).
Goldberg, E. H. (2007). Automated Estimating and Scheduling Using BIM (AEC in Focus Column). Cadalyst (Online Magazine), 24(9), 45-48.
Gu, N., Singh, V., Taylor, C., London, K., & Brankovic, L. (2007). Building information modelling : an issue of adoption and change management. Paper presented at the ICAN Conference, 28 August, 2007, Sydney, Australia.
Gujarathi, G. P., & Ma, Y. S. (2011). Parametric CAD/CAE integration using a common data model. Journal of Manufacturing Systems, 30(3), 118-132.
Hardie, M. P., Miller, G., Manley, K., & McFallan, S. (2005, 4 - 8 July, 2005). The quantity surveyor’s role in innovation generation, adoption and diffusion in the Australian construction industry. Paper presented at the Queensland University of Technology (QUT) Research Week, Brisbane, Australia.
Harris, F., McCaffer, R., & Edum-Fotwe, F. (2006). Modern Construction Management (Sixth ed.). Oxford, UK: Blackwell Publishing.
Holzer, D. (2007). Are you talking to me? BIM alone is not the answer. Paper presented at the Association of Architecture Schools Australasia Conference, University of Technology Sydney, Australia.
Huang, T., Li, H., Guo, H., Chan, N., Kong, S., & Skitmore, M. (2009). Construction virtual prototyping: a survey of use. Construction Innovation: Information, Process, Management, 9(4), 420-433.
Hubers, J. C. (2010). IFC-based BIM or Parametric design? Paper presented at the International Conference on Computing in Civil anf Building Engineering (ICCBE), Nottingham, UK.
Kim, S.-A., Chin, S., Yoon, S.-W., Shin, T.-H., Kim, Y.-S., & Choi, C. (2009). Automated Building Information Modeling System for Building Interior to Improve Productivity of BIM-based Quantity Take-Off. In Proceedings for the 26th International Symposium on Automation and Robotics in Construction (ISARC 2009), 492 - 496.
König, M., Beißert, U., & Bargstädt, H.-J. (2007, October 22-23, 2007). Visual Simulation - An Appropriate Approach To Support Execution Planning In Building Engineering. Paper presented at the 7th International Conference on Construction Applications of Virtual Reality.
Lawrence, M., Pottinger, R., Staub-French, S., & Nepal, M. P. (2014). Creating flexible mappings between Building Information Models and cost information. Automation in Construction, 45, 107-118.
Love, P. E. D., Edwards, D. J., & Han, S. (2011). Bad Apple Theory of Human Error and Building Information Modelling: A Systemic Model for BIM Implementation. Paper presented at the Proceedings of the 28th ISARC, Seoul, Korea.
Lowe, D., & Skitmore, M. (1994). Experiential learning in cost estimating. Construction Management and Economics, 12(5), 423-431.
Ma, Z., Wei, Z., & Zhang, X. (2013). Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model. Automation in Construction, 30, 126-135.
McCuen, T. (2009). Cost Estimating in BIM: The Fifth Dimension. Retrieved 30th September, 2011), from http://constructionadvisortoday.com/2009/11/cost-estimating-in-bim-the-fifth-dimension.html
Ogunlana, S., & Thorpe, A. (1991). The nature of estimating accuracy: Developing correct associations. Building and Environment, 26(2), 77-86.
Olatunji, O., Sher, W., & Gu, N. (2010). Building information modeling and quantity surveying practice. Emirates J Eng Res, 15(1), 67-70.
Olatunji, O. A. (2012). The impact of building information modelling on estimating practice: analysis of perspectives from four organizational business models. (Doctor of Philosophy Dissertation), University of Newcastle, Newcastle, Australia.
Olatunji, O. A. (2014). Views on building information modelling, procurement and contract management. Proceedings of the ICE-Management, Procurement and Law, 167(3), 117-126.
Olatunji, O. A., & Sher, W. (2010). Chapter VII: A Comparative Analysis of 2D Computer-Aided Estimating (CAE) and BIM Estimating Procedures. In J. Underwood & U. E. Isikdag (Eds.), Handbook of research on building information modeling and construction informatics: concepts and technologies (pp. 170 - 189): Information Science Reference.
Olatunji, O. A., & Sher, W. (2014). Investigating the activities in geometric 3D CAD estimating. ICE Proceedings: Management, Procurement and Law, Accepted.
Olatunji, O. A., Sher, W. D., & Gu, N. (2010). Building Information Modeling and Quantity Surveying Practice - whatever you thought, think again. Emirate Journal of Engineering Research (EJER), 15(1), 67-70.
Peterson, S., & Dagostino, F. R. (2010). Estimating in Building Construction (7th ed.): Pearson Higher Ed., USA.
Pratt, D. J. (2011). Fundamentals of Construction Estimating (Third ed.). Cliffton Park, NY: Delmar Cengage Learning.
Pučko, Z., Šuman, N., & Klanšek, U. (2014). Building Information Modeling Based Time And Cost Planning In Construction Projects. Organization, Technology & Management in Construction: An International Journal, 6 (1).
RICS. (2014). Building Cost Information Service. Retrieved 25 June, 2014, from http://www.rics.org/au/knowledge/bcis/about-bcis/bcis-overview/
Sabol, L. (2008). Challenges in Cost Estimating with Building Information Modeling. Design and Construction Strategies. Retrieved accessed December 8, 2010), from http://www.dcstrategies.net/news.php
Samphaongoen, P. (2010). A Visual Approach to Construction Cost Estimating. (Master's Theses), Marquette University, Milwaukee, Wisconsin.
Sattenini, A., Azhar, S., & Thuston, J. (2011). Preparing a building information model for facility maintenance and management. Paper presented at the 28th International Symposium on Automation and Robotics in Construction, Seoul, South Korea.
Sattenini, A., & Bradford, R. H. (2011). Estimating with BIM: A survey of US construction companies. Paper presented at the ISARC Conference, Seoul, Korea.
Seeley, I. H., & Murray, G. P. (2001). Civil Engineerng Quantities (Sixth Edition ed.): Palgrave Macmillan
Seeley, I. H., & Winfield, R. (1998). Building Quantities Explained (Building & Surveying) (5th ed.): Palgrave Macmillan.
Sher, W. (1982). Computer-aided measurement - a new development. South African Builder, 61(8), pp 41 - 45.
Sher, W. (1991). A review of construction computing in South Africa in 1991. In R. Schloss (Ed.), Merkel's Builders' Pricing and Management Manual (pp. 1227-1231): Thomsons Publications (South Africa).
Sher, W. (1996). Computer-aided Estimating - A guide to Good Practice. Harlow: Addison Wesley Longman Limited.
Skitmore, M. (1990). Which estimating technique? Paper presented at the The 11th International Cost Engineering Congress and 6th Association Francais des Ingenieurs et Techniciens D'estimation de Planification de Projets Annual Meeting, Paris, France.
Skitmore, M., & Wilcock, J. (1994). Estimating processes of smaller builders. Construction Management and Economics, 12, 139 - 154.
Smith, M., & Skitmore, M. R. (1991). Automatic BQ Pricing. Paper presented at the Transactions AACE 35th Annual Meeting, Seattle, Washington.
Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18(3), 357-375.
Tiwari, S., Odelson, J., Watt, A., & Khanzode, A. (2009). Model Based Estimating to Inform Target Value Design. Retrieved January 11, 2014, from http://www.aecbytes.com/buildingthefuture/2009/ModelBasedEstimating.html
Underwood, J., & Alshawi, M. (1997). Data and Process Models for the Integration of Estimating and Valuation. Microcomputers in Civil Engineering, 12, 369-381.
Velasquez, J. D., Lara, M. A., & Nof, S. Y. (2008). Systematic resolution of conflict situations in collaborative facility design. International Journal of Production Economics, 116(1), 139-153.
Vozzola, M., Cangialosi, G., & Lo Turco, M. (2009, 20-22 Sept. 2009). BIM Use in the Construction Process. Paper presented at the Management and Service Science, 2009. MASS '09. International Conference.
Yan, W. (2008). Environment-Behavior Simulation From CAD to BIM and Beyond. Paper presented at the Proceedings: ACADIA conference.
Yum, K. K., Froese, T., Aranda-Mena, G., Sher, W., & Goodman, N. (2008). Model-based estimating for concrete bridges: a feasibility study. In K. Brown, K. Hampson, P. S. Brandon & J. Pillay (Eds.), Clients driving construction innovation: Benefiting from innovation (pp. 101-109). Brisbane: Cooperative Research Centre for Construction Innovation.
Zhiliang, M., Zhenhua, W., Wu, S., & Zhe, L. (2011). Application and extension of the IFC standard in construction cost estimating for tendering in China. Automation in Construction, 20(2), 196-204.