Construction contractors involvement in disaster management planning

Main Article Content

Peter Stringfellow

Abstract

Disasters, both natural and man-made, cause major damage and loss of life. Because of this, governments around the world are looking at building resilience to ensure communities can recover quickly and have minimal impact from a disaster. Part of building resilience is to plan for disaster management and recovery. Literature reveals that construction contractors can play a critical role within this process as they have control of resource supply chains and key knowledge and skills they are well suited to assist in disaster planning. However, as literature also reveals there is currently little involvement of construction contractors in the disaster planning process. This gap between what should be done and what is currently done is investigated. Representatives from industry bodies are interviewed to determine their understanding of the industry’s involvement in disaster planning and what capacity the industry might have to be involved. The interviewee’s responses agree with current literature that there is currently little or no involvement with disaster planning however there is interest in being involved with disaster management planning if there was a forum for this to occur. Based on the responses the researcher has proposed a model to engage construction contractors within state government disaster management planning.

Article Details

How to Cite
Stringfellow, P. (2014). Construction contractors involvement in disaster management planning. Construction Economics and Building, 14(2), 120-132. https://doi.org/10.5130/AJCEB.v14i2.3912
Section
Viewpoints (Peer reviewed)

References

1. Australian Bureau of Statistics. (2012). Construciton Industry. Retrieved 2013, Septermber 23, from http://www.abs.gov.au/ausstats/abs@.nsf/Latestproducts/8772.0Main%20Features22011-12?opendocument&tabname=Summary&prodno=8772.0&issue=2011 12&num=&view=

2. Bosher, L., Carrillo, P., Dainty, A., Glass, J., & Price, A. (2007). Realising a resilient and sustainable built environment: towards a strategic agenda for the United Kingdom. Disasters, 31(3), 236-255. Retrieved from http://dx.doi.org/10.1111/j.1467-7717.2007.01007.x. doi:10.1111/j.1467-7717.2007.01007.x

3. Centre for Research on the Epidemiology of Disasters. (2012). Annual Disaster Statistical Review 2011. Retrieved March 29, 2013, from http://www.cred.be/publication/annual-disaster-statistical-review-2011

4. Chang-Richards, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2013). Resource challenges for housing reconstruction: A longitudinal study of the Australian bushfires. Disaster Prevention and Management, 22(2), 172-181. Retrieved from http://www.emeraldinsight.com/journals.htm?articleid=17087174&show=abstract.

5. Chang, Y., Wilkinson, S., Brunsdon, D., Seville, E., & Potangaroa, R. (2011). An integrated approach: managing resources for post-disaster reconstruction. Disasters, 35(4), 739-765. Retrieved from http://dx.doi.org/10.1111/j.1467-7717.2011.01240.x. doi:10.1111/j.1467-7717.2011.01240.x

6. Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2010, September). Resources and capacity: Lessons learned from post-disaster reconstruction resourcing in Indonesia, China and Australia. Paper presented at The 2010 Construction, Building and Real Estate Research Conference of the Royal Institution of Chartered Surveyors, Paris. Retrieved from http://hdl.handle.net/10652/1565

7. Chang, Y., Wilkinson, S., Potangaroa, R., & Seville, E. (2012). Managing resources in disaster recovery projects. Engineering, Construction and Architectural Management, 19(5), 557-580. doi:10.1108/09699981211259621

8. Chang, Y., Wilkinson, S., Seville, E., & Potangaroa, R. (2012). Changes in resource need for post-disaster reconstruction: a longitudinal study in China. Building Research & Information, 40(3), 327-336. Retrieved from http://dx.doi.org/10.1080/09613218.2012.684867. doi:10.1080/09613218.2012.684867

9. Chang, Y., Wilkinson, S., Seville, E., & Regan, P. (2010). Resourcing for a resilient post-disaster reconstruction environment. International Journal of Disaster Resilience in the Built Environment, 1(1), 65-83. Retrieved from ABI/INFORM Global; ProQuest Central.Retrieved from http://search.proquest.com.ezp01.library.qut.edu.au/docview/609933591?accountid=13380.

10. Chartered Institute of Building. (2013). Australasia. Retrieved 2013, September 20, from http://www.ciob.org/near-you/australasia-0

11. Commonwealth of Australia. (2011). National Strategy for Disaster Resilience. Retrieved May 23, 2013, from http://www.em.gov.au/Documents/1National%20Strategy%20for%20Disaster%20Resilience%20-%20pdf.PDF

12. Construciton in focus. (2013). Australian Institute of Building. Retrieved 2013, September 23, from http://www.constructioninfocus.com.au/index.php/2011/09/26/australian-building-institute/

13. Hindustan Construction Company. (n.d.). Disaster Relief. Retrieved April 13 2013, 2013from http://www.hccindia.com/four_pillars.php?page=corporate_stewardship&id=0

14. Jim O'Sullivan, & The Consultancy Bureau Pty Ltd. (2009). A Review Of Disaster Management Legislation And Policy In Queensland. Retrieved 2013, 11 May, from http://www.emergency.qld.gov.au/publications/pdf/consultants%20dm%20report%20final.pdf

15. Le Masurier, J., Rotimi, J. O., & Wilkinson, S. (2006). A comparison between routine construction and post-disaster reconstruction with case studies from New Zealand. In 22nd ARCOM Conference on Current advances in construction management research (pp. 4-6).

16. Lloyd-Jones, T. (2006). Mind the Gap! Post-disaster reconstruction and the transition from humanitarian relief. Retrieved from http://www.preventionweb.net/english/professional/publications/v.php?id=9080.

17. Lorch, R. (2005). What lessons must be learned from the tsunami? Building Research & Information, 33(3), 209-211. Retrieved from http://dx.doi.org/10.1080/09613210500070219. doi:10.1080/09613210500070219

18. Norman, S. (2006). New Zealand’s holistic framework for disaster recovery. The Australian Journal of Emergency Management, 21(4), 16-20. Retrieved from http://www.em.gov.au/Documents/New+Zealand's+holistic+framework.pdf.

19. Petrovic-Lazarevic, S. (2008). The development of corporate social responsibility in the Australian construction industry. Construction Management & Economics, 26(2), 93-101. doi:10.1080/01446190701819079

20. Queensland Government. (2011a). Rebuilding a stronger, more resilient Queensland. Retrieved 29 March 2013, from http://qldreconstruction.org.au/publications-guides/resilience-rebuilding-guidelines/rebuilding-astronger-more-resilient-queensland

21. Queensland Government. (2011b). Resources for Reconstruction. Retrieved 29 March 2013, from http://www.qldreconstruction.org.au/publications-guides/reconstruction-plans

22. Queensland Reconsruciton Authority. (2013). Queensland 2013 Flood Recovery Plan. Retrieved August 31, 2013, from http://qldreconstruction.org.au/publications-guides/reconstruction-plans/queensland-flood-recovery-program-2013

23. Queensland Reconstruction Authority. (2013). Strategic Plan 2013-14. Retrieved 2013, 7 October, from http://qldreconstruction.org.au/u/lib/cms2/Queensland-Reconstruction-Authority-Strategic-Plan-2013-14.pdf

24. Queensland State Disaster Management Group. (2010). Disaster Management Strategic Policy Framework. Retrieved 2013, May 23, from http://disaster.qld.gov.au/Disaster%20Resources/Documents/Disaster_Management_Strategic_Policy_Framework.pdf

25. R. Haigh, D. Amaratunga, & Kerimanginaye, K. (2006). An Exploration of the Construction Industry’s Role in Disaster Preparedness, Response and Recovery. In Annual Research Conference of the Royal Institue of Chartered Surveyors RICS.

26. Rotimi, J. O., Wilkinson, S., & Myburgh, D. (2011). Legislation for Effective Post-Disaster Reconstruction: Cases from New Zealand. In Post-Disaster Reconstruction of the Built Environment (pp. 151-174): Wiley-Blackwell.

27. Royal Institute of Chartered surveyors. (2013). Members. Retrieved 2013, September 20, from http://www.rics.org/au/find-a-member/?sd=y&cc=AU&fn=&ln=&ct=

28. Sadiqi "Wardak", Z., Coffey, V., & Trigunarsyah, B. (2012). Rebuilding housing after a disaster : factors for failure. Paper presented at Proceedings of 8th Annual International Conference of the International Institute for Infrastructure, Renewal and Reconstruction (IIIRR), Kumamoto, Japan. Retrieved from http://eprints.qut.edu.au/49862/

29. Siriwardena, M., Malalgoda, C., Thayaparan, M., Amaratunga, D., & Keraminiyage, K. (2013). Disaster resilient built environment: role of lifelong learning and the implications for higher education. International Journal of Strategic Property Management, 17(2), 174-187. Retrieved from http://dx.doi.org/10.3846/1648715X.2013.806373. doi:10.3846/1648715x.2013.806373

30. Town Planning and Urban Design Collaboartive. (2011). Disaster Response: Planning and Rebuildng toolkit. Retrieved March 29, 2013, from http://msucares.com/pubs/publications/p2677.pdf

31. United Nations Office for Disaster Risk Reduction (UNISDR). (2007). Hyogo Framework for Action 2005-2015: Building the Resilience of Nations and Communities to Disasters. Retrieved April 13, 2013, from http://www.unisdr.org/we/inform/publications/1037

32. University of Oregon - Partnership for Disaster Resilience. (2007). Post-Disaster Recovery Planning Forum: How-To Guide. Retrieved 2013, May 23, from http://nthmp.tsunami.gov/Minutes/oct-nov07/post-disaster_recovery_planning_forum_uo-csc-2.pdf

33. Wang, J.-J. (2012). Integrated model combined land-use planning and disaster management: The structure, context and contents. Disaster Prevention and Management, 21(1), 110-123. Retrieved from http://www.emeraldinsight.com/journals.htm?articleid=17015566&show=abstract.

34. World Economic Forum. (2011). A vision for managing natural disaster risk. Retrieved 2013, April 13, from http://www3.weforum.org/docs/WEF_VisionManagingNaturalDisaster_Proposal_2011.pdf

35. World Economic Forum. (2012). Engineering & Construction Disaster Resource Partnership. Retrieved from

36. Yan, C., Wilkinson, S., Potangaroa, R., & Seville, E. (2011). Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China. [Article]. Construction Management & Economics, 29(1), 37-48. Retrieved from bsh.Retrieved from http://gateway.library.qut.edu.au/login?url=http://search.ebscohost.com/login.aspx?direct=true&db=bsh&AN=57658034&site=ehost-live. doi:10.1080/01446193.2010.521761