Development of generic key performance indicators for PMBOK® using a 3D project integration model

Main Article Content

Craig Langston

Abstract

Since Martin Barnes’ so-called ‘iron triangle’ circa 1969, much debate has occurred over how best to describe the fundamental constraints that underpin project success. This paper develops a 3D project integration model for PMBOK® comprising core constraints of scope, cost, time and risk as a basis to propose six generic key performance indicators (KPIs) that articulate successful project delivery. These KPIs are defined as value, efficiency, speed, innovation, complexity and impact and can each be measured objectively as ratios of the core constraints. An overall KPI (denoted as s3/ctr) is also derived. The aim in this paper is to set out the case for such a model and to demonstrate how it can be employed to assess the performance of project teams in delivering successful outcomes at various stages in the project life cycle. As part of the model’s development, a new PMBOK® knowledge area concerning environmental management is advanced.

Article Details

How to Cite
Langston, C. (2013). Development of generic key performance indicators for PMBOK® using a 3D project integration model. Construction Economics and Building, 13(4), 78-91. https://doi.org/10.5130/AJCEB.v13i4.3658
Section
Viewpoints (Peer reviewed)

References

Al-Tmeemy, S.M.H.M., Abdul-Tahman, H. and Harun, Z. 2011. Future criteria for success of building projects in Malaysia. International Journal of Project Management. 29(3), 337-348.

Atkinson, R. 1999. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management. 17(6), 337-342.

Baccarini, D. 1996. The concept of project complexity: a review. International Journal of Project Management. 14(4), 201-204.

Bryde, D.J. 2003. Modelling project management performance. International Journal of Quality and Reliability Management. 20(2), 229-254.

Bryde, D.J. 2005. Methods for managing different perspectives of project success. British Journal of Management. 16(2), 119-131.

Bryde, D.J. and Robinson, L. 2005. Client versus contractor perspectives on project success criteria. International Journal of Project Management. 23(8), 622-629.

Chan, A.P.C. and Chan, A.P.L. 2004. Key performance indicators for measuring construction success. Benchmarking: An International Journal. 11(2), 203-221.

Cooke-Davies, T. 2002. The “real” success factors on projects. International Journal of Project Management. 20(3), 185-190.

Davis, K. 2013. Different stakeholder groups and their perceptions of project success. International Journal of Project Management. 31(8), article in press.

de Wit, A. 1988. Measurement of project success. International Journal of Project Management. 6(3), 164-170.

Dvir, D., Raz, T. and Shenhar, A.J. 2003. An empirical analysis of the relationship between project planning and project success. International Journal of Project Management. 21(2), 89-95.

Ebbesen, J.B. and Hope, A.J. 2013. Re-imagining the iron triangle: embedding sustainability into project constraints. PM World Journal. 2(3). Available online from http://pmworldjournal.net/article/re-imagining-the-iron-triangle-embedding-sustainability-into-project-constraints/.

Fernández-Sánchez, G. and Rodríguez-López, F. 2010. A methodology to identify sustainability indicators in construction project management: application to infrastructure projects in Spain, Ecological Indicators. 10, 1192-1201.

Fortune, J. and White, D. 2006. Framing of project critical success factors by a systems model. International Journal of Project Management, 24(1), 53-65.

Hwang, B.G. and Ng, W.J. 2013. Project management knowledge and skills for green construction: overcoming challenges. International Journal of Project Management. 31(2), 272-284.

Ika, L.A. 2009. Project success as a topic in project management journals. Project Management Journal. 40(4), 6-19.

Jha, K.N. and Iyer, K.C. 2007. Commitment, coordination, competence and the iron triangle. International Journal of Project Management. 25(5), 527-540.

Kirsilä, J., Hellström, M. and Wikström, K. 2007. Integration as a project management concept: a study of the commissioning process in industrial deliveries. International Journal of Project Management. 25(7), 714-721.

McLeod, L., Doolin, B. and MacDonell, S.G. 2012. A perspective-based understanding of project success. Project Management Journal. 43(5), 68-86.

Müller, R. and Turner, R. 2007. The influence of project managers on success criteria and project success by type of project. European Management Journal. 25(4), 298-309.

Munns, A.K. and Bjeirmi, B.F. 1996. The role of project management in achieving project success. International Journal of Project Management. 14(2), 81-87.

PMI 2013. A guide to the project management body of knowledge (PMBOK® Guide), Fifth Edition. Pennsylvania: Project Management Institute.

Saputra, Y.A. and Ladamay, O.S.A. 2011. Project reliability: probability of a project meets [sic] its quality-cost-time target under uncertainty. International Journal of Electronic Business Management. 9(3), 220-230.

Shenhar, A.J., Dvir, D., Levy, O. and Maltz, A.C. 2001. Project success: a multidimensional strategic concept. Long Range Planning. 34, 699-725.

Silvius, G., Schipper, R., Planko, J., van der Brink, J. and Köhler, A. 2012. Sustainability in project management. UK: Gower Publishing Ltd.

Tabish, S.Z.S. and Jha, K.N. 2012. Success traits for a construction project. Journal of Construction Engineering and Management. 138(10), 1131-1138.

Toor, S. and Ogunlana, S.O. 2010. Beyond the ‘iron triangle’: stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects. International Journal of Project Management. 28(3), 228-236.

Wateridge, J. 1998. How can IS/IT projects be measured for success? International Journal of Project Management. 16(1), 59-63.

Weaver, P. 2012. The demise of the iron triangle. Online blog, last accessed 27/08/2013. Available from http://network.projectmanagers.net/profiles/blogs/the-demise-of-the-iron-triangle.

Westerveld, E. 2003. The Project Excellence Model®: linking success criteria and critical success factors. International Journal of Project Management. 21(6), 411-418.

Zwikael, O. 2009. The relative importance of the PMBOK® Guide’s nine knowledge areas during project planning. Project Management Journal. 40(4), 94-103.