Assessing Project Suitability for Off-site Production

Main Article Content

Nick Blismas
Alistair Gibb
Christine Pasquire

Abstract

Implementation of off-site production on construction projects isoften hindered by a number of specific process and procurementconstraints. These constraints are largely influenced by decisionswithin the control of construction clients, suggesting that theyhave a significant influence over the adoption of off-site productioninto construction projects. However, an appreciation of the effectof these constraints has been lacking. Addressing this need, anoff-site production implementation assessment instrument thatresides within a larger toolkit (IMMPREST) was developed usingquestionnaire survey data and a series of industrial workshops.IMMPREST is an interactive electronic toolkit developed byLoughborough University (UK), in conjunction with eleven industrialpartners, which facilitates the evaluation of benefit arising fromuse of off-site production within construction. It identifies thefactors that need to be considered for an evaluation, the datarequired to assess the effect of these factors, and where therequired data resides within the supply chain. Development ofthe implementation assessment instrument is discussed, whilstalso making reference to the role that clients can play in creatingthe process and procurement conditions that promote rather thanconstrain the adoption of off-site production.

Article Details

How to Cite
Blismas, N., Gibb, A., & Pasquire, C. (2012). Assessing Project Suitability for Off-site Production. Construction Economics and Building, 5(1), 9-15. https://doi.org/10.5130/AJCEB.v5i1.2938
Section
Articles (Peer reviewed)
Author Biography

Nick Blismas, RMIT University

Senior Lecturer