Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives

Main Article Content

Alan Griffith
Andrew King
Andrew Knight

Abstract

Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

Article Details

How to Cite
Griffith, A., King, A., & Knight, A. (2012). Examining the Dynamics of Novation from the Principal Contractor’s and Architect’s Perspectives. Construction Economics and Building, 3(1), 13-18. https://doi.org/10.5130/AJCEB.v3i1.2907
Section
Articles (Peer reviewed)
Author Biography

Alan Griffith, Sheffield Hallam University

Senior Lecturer