The use of levelised cost in comparing supply and demand side options

UTSePress Research/Manakin Repository

Search UTSePress Research


Advanced Search

Browse

My Account

Show simple item record

dc.contributor.author Robinson Jim en_US
dc.contributor.author Fane Simon en_US
dc.contributor.author White Stuart en_US
dc.contributor.editor Australian Water Association en_US
dc.date.accessioned 2010-05-18T06:53:00Z
dc.date.available 2010-05-18T06:53:00Z
dc.date.issued 2002 en_US
dc.identifier 2004003413 en_US
dc.identifier.citation Fane Simon, Robinson Jim, and White Stuart 2002, 'The use of levelised cost in comparing supply and demand side options', AWA Bookshop, Sydney, pp. e20605a en_US
dc.identifier.issn 0-908255-53-5 en_US
dc.identifier.other E1 en_US
dc.identifier.uri http://hdl.handle.net/10453/7513
dc.description.abstract This paper explores the use of levelised cost in planning for infrastructure networks. Levelised cost provides a useful measure comparing supply or conservation options on varying scales on an equivalent basis. Comparison is made to annualised cost, a metric often used as a means of comparing different supply side options. Urban water supply is used as the primary example, however levelised cost is equally applicable to other infrastructure networks, such as electricity or gas. The levelised cost is calculated as the ratio of the present value of projected capital and operating cost of an option to the present value of the projected annual demand supplied or saved by the option. The paper demonstrates that levelised cost is the constant unit cost of supply, provided by an option at present value. It is also the average incremental cost of the option at the point of implementation. When translated to a unit cost, annualised cost does not account for unutilised capacity in large scale schemes, systematically under representing actual costs. By using levelised cost this inherent bias is removed. Use of levelised cost would facilitate the inclusion of smaller scale and more incremental supply options into infrastructure networks providing both economic and environmental benefits. en_US
dc.publisher AWA Bookshop en_US
dc.relation.hasversion Accepted manuscript version en_US
dc.relation.isbasedon http://www.isf.uts.edu.au/publications/faneetal2002uselevelisedcost.pdf en_US
dc.rights "©IWA Publishing 2002. The definitive peer-reviewed and edited version of this article is published in A unique approach to a unique environment 2002 and is available at www.iwapublishing.com. en_US
dc.title The use of levelised cost in comparing supply and demand side options en_US
dc.parent A unique approach to a unique environment en_US
dc.journal.volume en_US
dc.journal.number en_US
dc.publocation Sydney en_US
dc.identifier.startpage e20605a en_US
dc.identifier.endpage en_US
dc.cauo.name DVCRch.Institute for Sustainable Futures en_US
dc.conference en_US
dc.conference.location Melbourne, Australia en_US
dc.for 140205 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record