Risk Management for an Open CBS Project

UTSePress Research/Manakin Repository

Search UTSePress Research


Advanced Search

Browse

My Account

Show simple item record

dc.contributor.author O'Neill, T. en_US
dc.contributor.author Leaney, J. R en_US
dc.contributor.editor Titworth F en_US
dc.date.accessioned 2009-11-09T05:38:52Z
dc.date.available 2009-11-09T05:38:52Z
dc.date.issued 2001 en_US
dc.identifier 2006004375 en_US
dc.identifier.citation O'Neill, T. and Leaney, J. 2001 'Risk Management for an Open CBS Project', ECBS '01, The Institute of Electrical and Electronic Engineers Inc (IEEE), Washington DC, pp. 45-53. en_US
dc.identifier.issn 0-7695-1086-8 en_US
dc.identifier.other E1 en_US
dc.identifier.uri http://hdl.handle.net/10453/3159
dc.description.abstract Open Systems are being presented as the way forward for the construction of complex Computer Based Systems (CBS) of all types. They have had some success but as with all such attempts to solve problems in computing, it is being touted as a panacea. Three years of work by VTS into Open Systems has recognised the following pirfalls with the current Open Systems approaches. Firstly, there is no Open System specific engineering/architecting process to guide developers who want to build an Open System. Secondly, during the engineering of a supposed Open System there is no way to evaluate if they are actually building an Open System, or indeed if one has ultimately been built. And finally, there is no way of guaranteeing that the usual performance requirements of the system will be met by the Open approach. In this paper, application of the Open System Engineering Measures (OSEM) work performed by UTS is suggested as the basis of a system for monitoring and risk analysis of Open Systems. However, the measurement work is proposed as only one of the bases. UTS have also perj4ormed other research which could be invaluable if applied to monitoring and risk analysis. The other research focuses on a process for open systems development called an Open System Architecture Methodology (OSAM), and the performance prediction and analysis of open systems - Open System Performance Modelling (OSPM). If these three pieces of work were combined, then a comprehensive monitoring and risk analysis strategy could be put in place to manage three of the largest risk areas of any project. These areas are failure to produce a system which meets its performance deadlines; failure to produce a system which is built according to best engineering practice and failure to produce a system which is open, which allows interoperation, portability, scalability, and ultimately extensible at reasonable cost. In the past, the customer has open had no real strategy upon which to allay or confirm fears of the progress of a large, low volume production project. The system proposed herein would give the customer such a strategy. en_US
dc.publisher The Institute of Electrical and Electronic Engineers Inc (IEEE) en_US
dc.relation.isbasedon http://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=922404&isnumber=19939 en_US
dc.subject Risk management. en
dc.subject.mesh Computer based systems. en
dc.title Risk Management for an Open CBS Project en_US
dc.parent Proceedings of Eighth Annual IEEE International Conference and Workshop on the Engineering of Computer Based Systems (2001) en_US
dc.journal.volume en_US
dc.journal.number en_US
dc.publocation Piscataway NJ USA en_US
dc.identifier.startpage 45 en_US
dc.identifier.endpage 53 en_US
dc.cauo.name Engineering en_US
dc.conference ECBS '01 en_US
dc.conference.location Washington DC en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record