Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

Ibrahim Mahamid


The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.


risk management; road construction; time overrun; risk map; delay.

Full Text:



Alghbari, W., Kadir, M., Salim, A. and Ernawati (2007) 'The significant factors causing delay of building construction projects in Malaysia', Journal of Engineering, Construction and Architectural Management, 14 (2), 192-206,

Al-Momani, A. (2000) 'Construction delay: a quantitative analysis', International Journal of Project Management, 18 (1), 51â59,

Al-Najjar, J. (2008) Factors influencing time and cost overruns on construction projects in the Gaza Strip, Islamic University, Gaza

Chan, Daniel W. and Kumaraswamy, Mohan M. (1997) 'A comparative study of causes of time overruns in Hong Kong construction projects', International Journal of Project Management, 15 (1), 55-63,

Faridi, A. and El-sayegh, S. (2006) 'Significant factors causing delay in the UAE construction industry', Construction Management and Economics, 24, 1167â1176,

Koushki, P., Al-Rashid, K., and Kartam, N. (2005) 'Delays and cost increases in the construction of private residential projects in Kuwait', Construction Management and Economics, 23 (3), 285-294,

Mahamid, I. (2011) 'Risk Matrix for Factors Affecting Time Delay in Road Construction Projects: Owners' Perspective', Engineering, Construction and Architectural Management, 8 (6), 609 â 617

Mahamid, I. and Bruland, A. (2012) 'Cost deviation in road construction projects: The case of Palestine', Australasian Journal of Construction Economics and Building, 12 (1), 58 â 71

Mahamid, I., Bruland, A. and Dmaidi, N. (2012) 'Delay causes in road construction projects', ASCE Journal of Management in Engineering, 28 (3), 300â310,

Palstinian Contractor Union (PCU) Personal interview, March, 2011, Ramallah, The West Bank, Palestine

(PCBS/1) Palestinian Central Bureau of Statistics, The Palestinian economy performance, 2010, Palestine: Ramallah, PCBS, 2011, 43

(PCU/1) Palestinian Contractors Union, Construction Sector Profile. Palestine: West Bank, PCU, 2003

Sambasivan, M. and Soon, Y. (2007) 'Causes and effects of delays in Malaysian construction industry', International Journal of Project Management, 25 (5), 517-526,

The U.S. Federal Highway Administration Office of International Programs (2007) Guide to the risk assessment and allocation process in highway construction, Report, July, 2007, Retrieved from, 10th of April, 2012.