Applying Conjoint Analysis to Study Attitudes of Thai Government Organisations

Natee Suriyanon, Visuth Chovichien


Abstract

This article presents the application of choice-based conjointanalysis to analyse the attitude of Thai government organisationstowards the restriction of the contractor’s right to claimcompensation for unfavourable effects from undesirable events.The analysis reveals that the organisations want to restrict only 6out of 14 types of the claiming rights that were studied. The rightthat they want to restrict most is the right to claim for additionaldirect costs due to force majeure. They are willing to pay between0.087% - 0.210% of the total project direct cost for restricting eachtype of contractor right. The total additional cost for restrictingall six types of rights that the organisations are willing to pay is0.882%. The last section of this article applies the knowledgegained from a choice based conjoint analysis experiment to theanalysis of the standard contract of the Thai government. Theanalysis reveals three types of rights where Thai governmentorganisations are willing to forego restrictions, but the presentstandard contract does not grant such rights.

Full Text

PDF

References

Akintoye, A.S. and MacLeod, M.J. (1997) 'Risk analysis and management in construction', International Journal of Project Management, 15(1), 31-38. http://dx.doi.org/10.1016/S0263-7863(96)00035-X

ACES/AGC (2005) Enlightened risk allocation: The twenty-?rst century owner's guide to cost-effectiveness, The American Council of Engineering Companies and the Associated General Contractors of America, available at: http://www.mmcd.net/ downloads/Enlightened_Risk_Allocation.pdf.

ANDI (2006) 'The importance and allocation of risks in Indonesian construction projects', Construction Management and Economics, 24(1), 69-80. http://dx.doi.org/10.1080/01446190500310338

Ashley, D.B., Dunlop, J.R. and Parker, M.M. (1989) Impact of risk allocation and equity in construction contracts, A Report to the Construction Industry Institute, Source Document 44, Austin: University of Texas.

Bing, L., Akintoye, A.S., Edwards, P.J. and Hardcastle, C. (2004) 'The allocation of risk in PPP/PFI construction projects in the UK', International Journal of Project Management, 23(1), 25-35. http://dx.doi.org/10.1016/j.ijproman.2004.04.006

Diekmann, J.E. and Nelson, C.M. (1985) 'Construction claims: Frequency and severity', Journal of Construction Engineering and Management, 111(1), 74-81. http://dx.doi.org/10.1061/(ASCE)0733-9364(1985)111:1(74)

Downs, G. and Kettle H. (2008) 'Effective risk allocation in infrastructure projects', a presentation to the New Zealand Council for Infrastructure Development Building Nations Symposium, Auckland, 14 August, available at: www.inassociation.com. au/events/NZCID08/html/documents/BellGullycommentary_ NZCIDBuildingNationsSymposium2008.pdf.

El-Sayegh (2007) 'Risk assessment and allocation in the UAE construction industry', International Journal of Project Management, 26(4), 431-438. http://dx.doi.org/10.1016/j.ijproman.2007.07.004

Hartmann, A. and Sattler, H. (2002) Commercial use of conjoint analysis in Germany, Austria, and Switzerland, Research Papers on Marketing and Retailing, No. 006, University of Hamburg, available at: www.uni-hamburg.de/fachbereiche-einrichtungen/ fb03/ihm/rp6.pdf.

Hensher, D.A., Rose, J.M. and Greene, W.H. (2005) Applied choice analysis: A primer, Cambridge: Cambridge University Press.

Jergeas, G.F. and Hartman, F.T. (1996) 'A contract clause for allocating risks', Transaction of AACE International, D & RM.1.1-D & RM.1.3.

Kartam, N.A. and Kartam. S.A. (2001) 'Risk and its management in the Kuwaiti construction industry: A contractor's perspective', International Journal of Project Management, 22(6), 325-335. http://dx.doi.org/10.1016/S0263-7863(00)00014-4

Khan, Z.A. (1998) 'Risk premiums associated with exculpatory clauses', Master Thesis, Faculty of Graduate Study, University of Calgary.

Kumaraswamy, M.M. (1997) 'Con?icts, claims and disputes in construction', Engineering, Construction and Architectural Management, 4(2), 95-111.

Kumaraswamy, M.M. (1998a) 'Consequences of construction con?ict: A Hong Kong perspective', Journal of Management in Engineering, 14(3), 66-74.

Kumaraswamy, M.M. (1998b) 'Tracing the roots of construction claims and disputes', in proceedings of Cobra 1998 conference.

Loosemore, M. and McCarthy (2008) 'Perceptions of contractual risk allocation in construction supply chains', Journal of Professional Issues in Engineering Education and Practice, 134(1), 95-105. http://dx.doi.org/10.1061/(ASCE)1052-3928(2008)134:1(95)

Mohamed, R.Z. and Hartman, F.T. (2000) 'How to reduce your project cost', AACE International Transactions, PM.15.1-PM15.7.

Orme, B. (2006) Sample size issues for conjoint analysis studies, available at: www.sawtoothsoftware.com.

Rahman, M.M. and Kumaraswamy, M.M. (2002) 'Risk management trends in the construction industry: Moving towards joint risk management', Engineering, Construction and Architectural Management, 9(2), 131-151.

Sawtoothsoftware (2007) 2007 Customer survey results, available at: http://www.sawtoothsoftware.com/education/ss/ss27.shtml.

Semple, C., Hartman, F.T. and Jergeas, G. (1994) 'Construction claims and disputes: Causes and cost/time overruns', Journal of Construction Engineering and Management, 120(4), 785-794. http://dx.doi.org/10.1061/(ASCE)0733-9364(1994)120:4(785)

Sturts, C.S. and Grif?s, F.H. (2005) 'Addressing pricing: Value bidding for engineers and consultants', Journal of Construction Engineering and Management, 131(6), 621-630. http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:6(621)

Ward, S.C., Chapman, C.B. and Curtis, B. (1991) 'On the allocation of risk in construction projects', International Journal of Project Management, 9(3), 140-147. http://dx.doi.org/10.1016/0263-7863(91)90038-W

Yogeswaran, K., Kumaraswamy, M.M. and Miller, D.R.A. (1998) 'Claims for extensions of time in civil engineering projects', Construction Management and Economics, 16(3), 283-293. http://dx.doi.org/10.1080/014461998372312

Zaneldin, E.K. (2005) 'Construction claims in United Arab Emirates: Types, causes, and frequency', International Journal of Project Management, 24(5), 453-459. http://dx.doi.org/10.1016/j.ijproman.2006.02.006

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM