The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects

Mary Hardie, Shahed Khan, Angela O'Donnell, Graham Miller


Abstract

Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP) is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved.

Full Text

PDF

References

Anderson, J., and Mills, K. (2002). Refurbishment or redevelopment of office buildings? Sustainability comparisons." BRE, London."

Andrews, S. (1998), Waste Wise Construction Program Review: A report to ANZECC." Commonwealth Department of the Environment, Canberra."

Australian Bureau of Statistics. (2003). The WasteWise construction program." ABS Yearbook 2003, 620-622."

Australian Government Productivity Commission. (2006). Waste Management, Draft Report." Canberra."

Building Research Establishment. (2006). SMARTwaste." BRE.Available at http://www.smartwaste.co.uk/ Accessed 3"1 August 2006."

CB Richard Ellis Pty Ltd. (2006). Market View Sydney Metropolitan Office." M. Ciesielski, ed. Available at http://www.cbre.com.au/research/MarketView/ Sydney/ Accessed 3rt August 2006."

Chandrakanthi, M., Hettiaratchi, P., Prado, B., and Ruwanpura, J. Y. (2002).Optimization of the waste management for construction projects using simulation." Simulation Conference, 2002. Proceedings of the Winter, 1771-1777." http://dx.doi.org/10.1109/WSC.2002.1166464

Council of the City of Sydney. (2005). Policy for Waste Minimisation in New Developments." Available at http://www.cityofsydney.nsw.gov.au/Developm ent/PlanningControlsConditions/Development Policies.asp#link253 Accessed 3rd August."

Faniran, 0. O., and Caban. G. (1998). Minimizing waste on construction project sites." Engineering, Construction and Architectural Management, 5(2), 182-188."

Hurley, J. (2004). Valuing the Predemolition Audit." Deconstruction and Building Materials Reuse Conference, Oakland California."

Hurley, J., and Hobbs, G. (2006). UK Country Report on Deconstruction." Deconstruction: Techniques, Economics, and Safety, C. J. Kibert, A. Chini, and C. Hendriks, eds."

Jones Lang LaSalle. (2005). Building Refurbishment - Repositioning Your Asset for Success."Available at http://www.joneslanglasalle.com.au/en-gb/research/researchabstract?artid=1749 Accessed 3rd August 2006."

Kibert, C. J., Sendzimir, J. and Guy, B. (2000). Construction ecology and metabolism: natural analogues for a sustainable built environment." Construction Management and Economics, 18(8), 903-916." http://dx.doi.org/10.1080/014461900446867

Kwan, J., Mallett, H., Mason, S., and Spencer, D. (2001). Tools for measuring and forecasting waste generated on site. Scoping study (PR083)." CIRIA, London."

Lingard, H., Gilbert, G, and Graham, P. (2001). Improving solid waste reduction and recycling performance using goal setting and feedback." Construction Management & Economics, 19(8), 809-817." http://dx.doi.org/10.1080/01446190110070952

Lingard, H., Graham, P., and Smithers, G. (2000). Employee perceptions of the solid waste management system operating in a large Australian contracting organization: implications for company policy implementation." Construction Management and Economics, 18(4), 383-393." http://dx.doi.org/10.1080/01446190050024806

Malin, N. (2006). Wallboard Recycling Monster Arrives from Europe." Green Source, McGraw Hill Construction."

Martin, A., and Scott, I. (2003). The Effectiveness of the UK Landfill Tax." Journal of Environmental Planning and Management, 46(5), 673 - 689." http://dx.doi.org/10.1080/0964056032000138436

McDonald, B., and Smithers, M. (1998). Implementing a waste management plan during the construction phase of a project: A case study." Construction Management and Economics, 16(1), 71-78." http://dx.doi.org/10.1080/014461998372600

McGrath, C. (2001). Waste minimisation in practice." Resources, Conservation and Recycling, 32(3-4), 227-238." http://dx.doi.org/10.1016/S0921-3449(01)00063-5

Mills, T. H., Showalter, E., and Jarman, D. (1999). Cost-effective waste management plan." Cost Engineering, 41(3), 35-43."

Seydel, A., Wilson, O. D., and Skitmore, R. M. (2002). Financial Evaluation of Waste Management Methods: A Case Study." Journal of Construction Research, 3(1), 167-179." http://dx.doi.org/10.1142/S1609945102000126

Shen, L. Y Tarn, V. W. Y., Tarn, C. M., and Drew, D. (2004). Mapping Approach for Examining Waste Management on Construction Sites." Construction Engineering and Management, 130(4), 472-481." http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:4(472)

Teo, M. M. M and Loosemore, M. (2001). A theory of waste behaviour in the construction industry." Construction Management & Economics, 19(7), 741-751." http://dx.doi.org/10.1080/01446190110067037

Zhou, X. (1993). Occupational Power, State Capacities, and the Diffusion of Licensing in the American States: 1890 to 1950, American Sociological Review, 58(4), pp 536-552.

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM