Design-Build: How to Increase Its Usage and Its Impact on Architects and Contractors in Singapore

Florence Ling


Abstract

The purpose of this paper is to explore the ways to increase the usage of design-build (DB). The scope covers how project managers (local and foreign) can play a role in increasing DB usage in Singapore. It is found that owners would adopt DB if their requirements can be properly met. This is achieved by having clear and comprehensive bid documents, having sketch designs prepared by client appointed consultants, and engaging experienced DB contractors. Clients also need to engage project managers and consultant quantity surveyors to manage the DB projects, but the liability for design rests on DB contractors. Clients want DB contractors to provide warranty for fitness for purpose. The conclusion is that clients welcome the use of DB if some concrete steps are taken to make it meet their needs better. This study also concludes that consulting and contracting companies welcome DB, as this procurement method does not have a significantly negative impact on them.

Full Text

PDF

References

Akintoye, A. (1994). Design and build: a survey of construction contractors' views. Construction Management and Economics, 12, 155-163. http://dx.doi.org/10.1080/01446199400000021

Akintoye, A. and Fitzgerald, E. (1995). Design and build: a survey of architects views. Engineering, Construction and Architectural Management, 2(1), 27-44." http://dx.doi.org/10.1108/eb021001

Bennett, J., Pothecary, E. and Robinson, G. (1996). Designing and building a world-class industry. Centre for Strategic Studies in Construction, Reading.

Betts, M., Walker, S.P. and Clark, A.M. (1997). Re-engineering the construction process and its implications for construction management research. In Proceedings of the International Conference on Construction Process Re-engineering (edited by S. Mohamed), pp. 671-684. Griffith University, Queensland.

Building and Construction Authority (2005). D & B projects awarded in Singapore. Downloaded from http://www.bca.gov on 15 July 2005.

Cecil, R. (1983). Contracts - design and build. Architects Journal, 30 March, 61-62.

Chan, A.P.C. and Lam, P.T. (1995). Novation contract: an innovative variation to design-build. In Proceedings of the First International Congress on Construction: Design and Build Projects - International Experiences, pp. 197-203. National University of Singapore, Singapore. http://dx.doi.org/10.1016/0010-7824(94)00001-D

Dreger, G.T. (1993, September). Design-build procurement: strategies for success. In Proceedings of CIB W-65 symposium on organisation and management of construction: the way forward, pp. 749-757. University of the West Indies, Port of Spain, Trinidad.

Friedlander, M.C. (1998). Design and build solutions. Journal of Management in Engineering, 14(6), 59-64. http://dx.doi.org/10.1061/(ASCE)0742-597X(1998)14:6(59)

Gardiner, P.D. and Simmons, J.E.L. (1995). Case explorations in construction conflict management. Construction Management and Economics, 13(3), 219-234. http://dx.doi.org/10.1080/01446199500000026

Greenfield, S.S. (1982). Turnkey construction in the United States. ASCE Journal of the Construction Division, 108, 201-210.

Hodgson, G.J. and Bayfield, P. (1996). Risk management and working relationships in design and build highway projects? In Proceedings of CIB W92 Procurement Systems- North Meets South: Developing Ideas (edited by R.G. Taylor), pp. 225-238. University of Natal, Durban, South Africa.

Janssens, D.E.L. (1991). Design-build explained. Macmillan, London.

Katsanis, C.J. and Davidson, C.H. (1998). Horizon 2020: design-build. In Proceedings of CIB World Building Congress- Construction and the Environment, pp. 2025-2032. CIB, Sweden.

Kawaguchi, S.K., Poirot, J.W., Carty, G.J. and Arens, M. (1994). More on design-build. Engineering News Record, 22 August, 2.

Kluenker, C.H. (1996). The construction manager as project integrator. Journal of Management in Engineering, 12(2), 17-20. http://dx.doi.org/10.1061/(ASCE)0742-597X(1996)12:2(17)

Konchar, M and Sanvido, V. (1998). Comparison of US project delivery systems. Journal of Construction Engineering and Management, 124(6), 435-444. http://dx.doi.org/10.1061/(ASCE)0733-9364(1998)124:6(435)

Latham, M. (1994). Constructing the team. HMSO, London.

Ling, Y.Y., Khee, H.Y. and Lim, K.S.G. (2000). The reasons why owners prefer to procure more projects based on design-bid-build than design-and-build. Journal of Construction Procurement, 6(2), 135-146.

Ling, Y.Y., Lok, S. and Tan, E.S.M. (2001). Design-build projects: a comparison of views between South Australia and Singapore. In Proceedings of the CIB World Building Congress- Performance in Product and Practice, pp. 349-359. CIB, Wellington.

Ling, Y.Y. and Kerh, S.H. (2004). Comparing the performance of design-build and design-bid-build projects. Architectural Science Review, 47(2), 163-175. http://dx.doi.org/10.1080/00038628.2004.9697040

Ling, Y.Y., Chan, S.L., Chong, E. and Ee, L.P. (2004). Predicting performance of DB and DBB projects. Journal of Construction Engineering and Management, 130(1), 75-83. http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:1(75)

Ling, Y.Y. and Leong, E.F.K. (2002). Performance of DB projects in terms of cost, quality and time: views of clients, architects and contractors in Singapore. The Australian Journal of Construction Economics and Building, 2(1), 37-46.

Ling, Y.Y. (2004a). How project managers can better control the performance of DB projects. International Journal of Project Management, 22(6), 477-488. http://dx.doi.org/10.1016/j.ijproman.2003.09.003

Ling, Y.Y. (2004b). Key performance determinants in design-bid-build projects. Building Research and Information, 32(2), 128-139. http://dx.doi.org/10.1080/096132103200048497

Love, P.E.D. and Li, H. (1998). From BPR to CPR- conceptualizing re-engineering in construction, Business Process Management Journal, 4(4), 291-305. http://dx.doi.org/10.1108/14637159810238192

Marshall, S. and Morledge, R. (1988). Risking design and build. Chartered Quantity Surveyor, 25-26.

Murray, J.P. (1995). Effective briefing: the key to project success. In Proceedings of the First International Congress on Construction: Design and Build Projects - International Experiences, pp. 72-80. National University of Singapore, Singapore.

Nahapiet, H. and Nahapiet, J. (1985). The Management of Construction Projects - Case Studies from the USA and UK. CIOB, Ascot.

National Joint Consultative Committee (NJCC). (1985). Code of Procedure for Selective Bidding for Design and Build, London.

Ndekugri, I. and Church, R. (1996). Construction procurement by the design and build approach: a survey of problems. In Proceedings of CIB W92 Procurement Systems- North Meets South: Developing Ideas (edited by R.G. Taylor), pp. 452-462. University of Natal, Durban, South Africa.

Ndekugri, I. and Turner, A. (1994). Building procurement by design and build approach. Journal of Construction Engineering and Management, 120, 243-256. http://dx.doi.org/10.1061/(ASCE)0733-9364(1994)120:2(243)

Osborne, G.H. (1996, May). Overseas practices and lessons- UK. Paper presented at the CIDB Design and Build Conference, Singapore.

Pain, J. and Bennett, J. (1988). JCT with contractor's design form of contract: a study in use. Construction Management and Economics, 6, 307-337. http://dx.doi.org/10.1080/01446198800000026

Songer, A.D., Molenaar, K.R. and Robinson, G.D. (1996). Selection factors and success criteria for design-build in the US and UK. Journal of Construction Procurement, 2(2), 69-82.

Tarricone, P. (1996). Design-build it, and they will come. Facility Design and Management, September, 60-63.

Tookey, J.E., Murray, M., Hardcastle, C. and Langford, D. (2001). Construction procurement routes: re-defining the contours of construction procurement. Engineering, Construction and Architectural Management, 8(1), 20-30.

Yates, J.K. (1995). Use of design/build in E/C industry. Journal of Management in Engineering, 11(6), 33-38. http://dx.doi.org/10.1061/(ASCE)0742-597X(1995)11:6(33)

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM