A Systematic Approach to Modelling Change Processes in Construction Projects

Ibrahim Motawa


Abstract

Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

Full Text

PDF

References

CII (1994), Project change management, special publication 43-1, Construction Industry Institute (CII), The University of Texas at Austin, US.

CII Conference (1996), Project change management, implementation feedback report.

CIRIA (2001), Managing project change - A best practice guide, Construction Industry Research and Information Association.

Cox, I.D., Morris, J.P., Rogerson, J.H., and Jared, G.E. (1999), 'A quantitative study of post contract award design changes in construction', Journal of Construction Management and Economics, no.17, pp.427-439. http://dx.doi.org/10.1080/014461999371358

Hester, W.T., Kuprenas, J.A. and Chang, T.C. (1991), 'Construction changes and change orders: their magnitude and impact', Construction Industry Institute (CII), Source document 66, CII, Austin, Tex.

Ibbs, C.W., Wong, C.K., and Kwak, Y.H. (2001), 'Project change management system', Journal of Management in Engineering, ASCE, vo. 17, no.3, pp.159-165. http://dx.doi.org/10.1061/(ASCE)0742-597X(2001)17:3(159)

Motawa, I.A., Anumba, C.J., El-Hamalawi, A., Chung, P.W. H. and Yeoh, M. (2003a), 'Modelling change processes within construction projects', in proceedings of the Second International Conference on Structural and Construction Engineering (ISEC-02), 23-26 September, Rome, Italy, pp.2185-2190.

Motawa, I.A., Anumba, C.J., El-Hamalawi, A., Chung, P.W. H. and Yeoh, M. (2003b), 'An innovative approach to the assessment of change implementation in construction projects', in proceedings of the 2nd International Conference on Innovation in Architecture, Engineering and Construction, Loughborough University, UK, June 25-27, pp.729-740.

Motawa, I.A., Anumba, C.J., El-Hamalawi, A., Sun, M., Chung, P.W.H. and Yeoh, M. (2003c), 'A fuzzy model for change prediction in construction projects', in proceedings of the 10th EG-ICE International Workshop on Intelligent Computing in Engineering, (European Group for Intelligent Computing in Engineering), July 3-4, Delft University of Technology, Delft, The Netherlands, pp.44-52.

Motawa, I.A., Anumba, C.J., El-Hamalawi, A., Chung, P.W.H., Yeoh, M., and Sun, M. (2004), 'Development a fuzzy system for change prediction in construction projects', in proceedings of the Xth International Conference on Computing in Civil and Building Engineering, Weimar, Germany, June 02-04.

Stocks, S.N. and Singh A. (1999), 'Studies on the impact of functional analysis concept design on reduction in change orders', Journal of Construction Management and Economics, vol.17, pp.251-267. http://dx.doi.org/10.1080/014461999371475

Williams, T.M. (2000), 'Safety regulation changes during projects: the use of system dynamics to quantify the effects of change', International Journal of Project Management, vol.18, no.1, pp.23-31. http://dx.doi.org/10.1016/S0263-7863(98)00063-5

Voropajev, V. (1998), 'Change management - a key integrative function of PM in transition economies', International Journal of Project Management, vol.16, no.1, pp.15-19. http://dx.doi.org/10.1016/S0263-7863(97)00010-0

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM