Application of Project Time Management Tools and Techniques to the Construction Industry in the Gaza Strip

Nabil Sawalhi, Adnan Enshassi


Abstract

The objective of this paper is to investigate the level of applying theproject time management tools and techniques by public ownersand construction contractors in the Gaza Strip. This study hasbeen conducted by means of a survey questionnaire. Seventythreequestionnaires were distributed to target constructioncontractors and twenty-five questionnaires to public owners. Sixtycompleted questionnaires from contractors and twenty-threequestionnaires from public owners were received and analysed.The survey results indicated that contemporary project timemanagement tools and techniques are not widely used amonglocal contractors and owners. Lack of subcontractor’s knowledgeand awareness of the importance of project time managementtools and techniques are still major obstacles toward the efficientutilisation of such tools. This study recommended that there is anurgent need to establish a professional industry body such as anInstitute of Building to review and evaluate existing local projectmanagement practices. This professional body may be establishedby the government through the Ministry of Housing and PublicWorks or by the local university in cooperation with a similarinternational professional industry body. Current training effortshould be tailored to encourage owners and contractors to usework breakdown structures, resource optimisation, and networkscheduling.

Full Text

PDF

References

Abbasi, G. and Al-Mharmah, H. (2000), 'Project management by the public sector in a developing country', International Journal of Project Management, vol.18, no.2, pp.105-109. http://dx.doi.org/10.1016/S0263-7863(98)00074-X

Enshassi, A. (1997), 'Site organization and supervision in housing project in the Gaza Strip', International Journal of Project Management, vol.15, no.2, pp.93-99. http://dx.doi.org/10.1016/S0263-7863(96)00044-0

FAFO Report (1993), Palestine Society.

Hutchings, D.M. and Christofferson, J.P. (2000), 'A study of management practices in small-volume home building companies', in proceedings of the ASC 36th Annual Conference, Purdue University, Indiana, pp.211-220.

Hutchings, D.M. and Christofferson, J.P. (2001), 'Management practices of residential construction companies producing 25 and fewer annually', in proceedings of the ASC 37th Annual Conference, University of Denver, Colorado, pp.115-121.

Kazi, A.S. (2002), Project planning and control parameter analysis, mail questionnaire.

MAS (2001), Economic monitoring report, Palestinian Economic Policy Research Institute, (www.palecon.org/masdir/monitor/monitor.html).

Mezher, T. and Tawil, W. (1998), 'Causes of delays in the construction industry in Lebanon', Engineering Construction and Architectural Management Journal, vol.5, no.3, pp.251-260.

PECDAR (1997), Housing in Palestine, (www.pecdar.org).

PCBS (2000), Number of enterprises and persons engaged for construction contractors (1995-1999), the Palestinian Central Bureau of Statistics, (www.pcbs.org).

Shash A. and Al-abdullatif A.M. (1993), 'A survey of planning and controlling techniques used by construction contractors in Saudi Arabia', Cost Engineering, vol.35, no.2, pp.95-112.

White, D. and Fortune, J. (2002), 'Current practice in project management – an imperial study', International Journal of Project Management, vol.20, no.3.

World Bank (2001), West Bank and Gaza in brief, (www.worldbank.org).

Yang, M.L., Chuah, K.B., Rao Tummala, V.M. and Chen, E.H. (1997), 'Project management practices in Pudong', International Journal of Project Management, vol.15, no.5, pp.313-319. http://dx.doi.org/10.1016/S0263-7863(96)00084-1

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM