Why is Design-Build Commonly Used in the Public Sector? An Illustration from Hong Kong

Edmond Lam, Albert Chan, Daniel Chan


Abstract

The Design and Build (D&B) procurement method is one of the systems advocated to overcome inadequacies with the traditional procurement method. In recent years, this innovative procurement method has been put to practice in Hong Kong where a vast amount of infrastructure works is taking place. This paper aims to illustrate the applicability of design-build in the Hong Kong setting.As most D&B projects are undertaken by the public sector of Hong Kong, the main features of a public sector project and reasons for its wider use on D&B are fully examined in the paper. To further explore the benefits of D&B in actual practice, structured interviews have been conducted with clients, contractors and consultants running D&B projects in Hong Kong. Summary of major problems of running D&B projects from the previous study by the authors is also outlined. With the increasing use of D&B in the public sector of Hong Kong and worldwide, more research can be undertaken on the quantitative comparison of the traditional mode of procurement and how to carry out a D&B project successfully so as to develop a knowledge base for the D&B procurement method.

Full Text

PDF

References

Akintoye, A. (1994). Design and build: a survey of construction contractors' views. Construction Management and Economics, 12(2), 155-163. http://dx.doi.org/10.1080/01446199400000021

Chan, A. P. C. (2000). Evaluation of enhanced design and build system: A case study of a hospital project. Construction Management and Economics, 18 (8), 863-871. http://dx.doi.org/10.1080/014461900433140

Chan, A. P. C., Vu, A. T. Wand Tam, C. M. (1999). Enhanced design build-An Innovative system to procure a hospital project. In: Ogunlana S. O. (Ed .) Profitable Partnering in Construction Procurement, CIB W92 and CIB TG 23 Joint Symposium, E & FN Spon, Longdon, 405-415.

Chan, A. P. C. and Yung, E. H. K. (2000). Research monograph: Procurement selection model for Hong Kong, Department of Building and Real Estate, The Hong Kong Polytechnic University.

Chan, A. P. C., Scott, D. and Lam, E. W M. (2001). Study of design & build projects in Hong Kong. Proceedings of The Third International Conference on Construction Project Management, 29-30 March 2001, Singapore, 366-376.

Construction Industry Review Committee (Cl RC) (2001). Construct for excellence-Report of the Construction Industry Review Committee 2001, HKSAR.

Culp, G. and Smith, A. (2001). Understanding psychological type to improve project team performance. Journal of Management in Engineering, ASCE, 17(1), 24-33. http://dx.doi.org/10.1061/(ASCE)0742-597X(2001)17:1(24)

Deakin, P. (1999). Client's local experience on design and build projects. Seminar Proceedings on Design and Build Procurement System, January 1999, Hong Kong, 11-16.

Environmental, Transport and Works Bureau (2002). Unpublished Statistics from Note for Public Works Subcommittee of Finance Committee, Hong Kong.

Ernsen, J. J. and Schexnayder, C. (2000). One company's experience with design/build: labour cost risk and profit potential. Journal of Construction Engineering and Management, ASCE, 126(1), 10-14. http://dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:1(10)

Finance Bureau (2000). Enhanced productivity programme (1999-2000), HKSAR.

Franks, J. (1998). Building procurement systems: A client's guide, 3rd edition, England: Chartered Institute of Building.

Haltenhoff, C. E. (1986). The forms and variations of the CM system, Construction Management: a state-of-the-art update, October 27, 1986, Boston, Massachusetts, USA, 1-15.

Hatush, S. and Skitmore, M. (1997).Assessment and evaluation of contractor data against client goals using PERT approach. Construction Management and Economics, 15(1), 327-340. http://dx.doi.org/10.1080/014461997372881

Ho, D. C. W, Chau, K. Wand Leung, H. F. (1996). Are contractors prepared to take on design and build contracts. Proceedings of CIB W92-Procurement Systems North meets South: Developing Ideas, South Africa, 14-17 January 1996, 213-224.

Hong Kong Construction Association (1990). Design and build sub-group report to the joint discussion group on the standard form of conditions of contract. Hong Kong Construction Association, Occasional Paper.

Hong Kong Housing Authority (2002). Unpublished statistics from Housing Authority Contracts under Private Sector Participation Scheme, Hong Kong.

Huque, A. S., Lee, G. O. M. and Cheung, A. B. L. (1998). The civil service in Hong Kong continuity and change. Hong Kong University Press, Hong Kong.

Kumaraswamy, M. M. and Walker, D. H. T. Multiple performance criteria for evaluating construction contractors. Procurement systems: a guide to best practice in construction, New York: E & FN Spon, 228-251.

La Grange, A. and Pretorius, F. (1996). Privatization of public housing in Hong Kong: An assessment of the private sector participation scheme. Proceedings of CIB W92-Procurement Systems North meets South: Developing Ideas, 14-17 January 1996, South Africa, 261-274.

Lam, E. W. M., Chan, A. P. C. and Chan, D. W. M. (2003). Potential Problems of Running Design-Build Projects in Construction. HKIE Transactions. (In press).

Lam, P. T. I. (1990). Report on a critical comparison of the construction procurement and contracting systems in Japan, Singapore, Malaysia and Hong Kong. Department of Building and Surveying, Hong Kong Polytechnic: Hong Kong.

Lam, P. T. I. and Chan, A. P. C. (1995). An empirical study of design and build and other procurement approaches in Asia-Pacific countries. Design and Build Projects-International Experiences, International Congress on Construction, 5-6 October 1995, Singapore, 213-222.

Latham, M. (1994). Constructing the Team-A Report on the UK Construction Industry, HMSO, UK.

Leong, C. (1991). Accountability and project management: a convergence of objectives. International Journal of Project Management, 9(4), 241-249. http://dx.doi.org/10.1016/0263-7863(91)90033-R

Masterman, J. W. E. (2002). Introduction to building procurement systems. 2nd ed., London; New York.

Mo, J. K. W. and Ng, L. Y. (1997). Design and build procurement method in Hong Kong -An overview. CIB W92 Symposium Procurement -a key to innovation, University de Montreal, 20-23 May 1997, 453-463.

Molenaar, K. R. and Songer, A. D. (1998). Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), 467-479. http://dx.doi.org/10.1061/(ASCE)0733-9364(1998)124:6(467)

Ndekugri, I. and Church, R. (1996). Construction procurement by the design and build approach: A survey of problems. Proceedings of CIB W92 Procurement Systems North meets South: Developing Ideas, South Africa, 14-17 January 1996, 452-462.

Palaneeswaran, E. and Kumaraswamy, M. M. (2000). Benchmarking contractor selection practices in public-sector construction -a proposed model. Engineering, Construction and Architectural Management 2000, 7(3), 285-299.

Palaneeswaran, E. and Kumaraswamy, M. M. (2001). Reinforcing design-build contractor selection: A Hong Kong Perspective. HKIE Transactions, 8(1), 7-12.

Pearson, M. and Skues, D. (1999). Control of projects implemented through design and build contracts. Seminar Proceedings on Design and Build Procurement System January 1999, Hong Kong, 49-60.

Rwelamila, P. D. and Hall, KA (1994). An inadequate traditional procurement system? Where do we go from here? East meets West, CIB-W92 Symposium, Hong Kong, 107-114.

Riggs, J. L., Goodman, M., Finley, R. and Miller, T. A. (1992). Decision support system for predicting project success. Project Management Journal, 22(3), 37-43.

Rizzo, J. (1998). Design/build alternative: a contracting method. Journal of Management in Engineering, ASCE, 14(6), 44-47. http://dx.doi.org/10.1061/(ASCE)0742-597X(1998)14:6(44)

Rowlinson, S. M. and Walker, A. (1995). The construction industry in Hong Kong, Longman.

Scott, P. S. and Showalter, W. E. (1986). The history of construction management. Construction Management: a state-of-the-art Update, October 27, 1986, Boston, Massachusetts, USA, 51-61.

Smith, A. and Wilkins, B. (1996). Team relationships and related critical factors in the successful procurement of health care facilities. Journal of Construction Procurement, 2(1), 30-40.

Songer, A. D. and Molenaar, K. R. (1996). Selecting design-build: public and private sector owner attitudes. Journal of Management in Engineering, ASCE, 12(6), 47-53. http://dx.doi.org/10.1061/(ASCE)0742-597X(1996)12:6(47)

Tam, C. M. (1997). Design and build for a complicated re-development project in Hong Kong: The Happy Valley Racecourse Redevelopment. CIB W92 Symposium 1997, University de Montreal, May 1997, 743-750.

Walker, A. (1995). Hong Kong: The contractors' experience, Hong Kong University: Hong Kong.

Wilkins, B. (1999). Customer Orientation in the Delivery of Public Works -The Impact on Building Procurement in Hong Kong. Profitable Partnering in Construction Procurement, CIB W92 and CIB TG 23 Joint Symposium, E & FN Spon, Longdon, 147-155.

Works Bureau (1999). Administrative procedures for use with The Government of The Hong Kong Special Administrative Region General Conditions of Contract for design and build contracts, HKSARG, 1999 edition.