Decision Criteria and Their Subjectivity in Construction Procurement Selection

Thomas Ng, Duc Luu, Swee Chen


Abstract

Employing a suitable construction procurement system is crucial to project success. However,many clients select procurement systems in a cursory manner and some clientseven use a specific procurement system by default without deliberate choice. A systematicmethod for procurement selection would help clients to arrive at more informed decisions.The first step towards a systematic procurement selection method is to identify decisioncriteria pertinent to assessing the alternatives. This paper identifies the commonly consideredcriteria for procurement selection through a qualitative survey in Australia. The subjectivityof the identified criteria is considered and the effects on procurement selectionare examined. The results indicate that speed, complexity, flexibility, responsibility, qualitylevel, risk allocation, and price competition cannot be easily gauged by objective means,and a misperception of the degree of fulfilment of any of these criteria could affect theoutcome of procurement selection.

Full Text

PDF

References

Alhazmi, T. and McCaffer, R. (2000) Project procurement system selection model. Jour-nal of Construction Engineering and Man-agement, ASCE, 126 (3), 176–184. http://dx.doi.org/10.1061/(ASCE)0733-9364(2000)126:3(176)

Ambrose, M.D. and Tucker, S.N. (1999) Matching a procurement system to client and project needs: a procurement system evaluator. In: Bowen, P.A. and Hindle, R.D (eds.) Proceedings: Customer Satisfaction: A Focus for Research and Practice in Con-struction, University of Cape Town, South Africa, 280–288.

Ayyub, B.M. and Haldar, A. (1984) Project Scheduling Using Set Concepts. Journal of Construction Engineering and Management, ASCE, 110 (2), 189–204. http://dx.doi.org/10.1061/(ASCE)0733-9364(1984)110:2(189)

Bennett, J. and Grice, A. (1990) Procurement systems for building, Quantity Surveying Techniques – New Directions, Brandon, P.S.(ed.). BSP Professional Books, Oxford.

Bennett, J. and Flanagan, R. (1983) For the good of the client. Building, 1st April, 26–27.

Brandon, P., Basden, A. and Hamilton, I.W. (1988) Expert System: The Strategic Plan-ning of Construction Projects. Royal Institu-tion of Chartered Surveyors and University of Salford, Salford University Press, Salford.

Burgess, R.G. (1989) In the Field: An Intro-duction to Field Research. Onwn Hyman, London.

Cheung, S.O., Lam, T.I., Wan, Y.W. and Lam, K.C. (2001) Improving objectivity in procure-ment selection, Journal of Management in Engineering, ASCE, 17 (3), 132–139. http://dx.doi.org/10.1061/(ASCE)0742-597X(2001)17:3(132)

Chua, D.K.H., Kog, Y.C. and Loh, P.K. (1999) Critical success factors for different project objectives. Journal of Construction Engi-neering and Management, ASCE, 125 (3), 142–150. http://dx.doi.org/10.1061/(ASCE)0733-9364(1999)125:3(142)

Fellows, R.F. (1993) Contracts for Refur-bishment. School of Architecture and Build-ing Engineering, University of Bath Press, Bath.

Franks, J. (1990) Building Procurement Sys-tems – A Guide to Building Project Man-agement. Chartered Institute of Building, Ascot.

Griffith, A. and Headley, J.D. (1997) Using a weighted score model as an aid to selecting procurement methods for small building projects. Construction Management and Economics, 15 (4), 341–348. http://dx.doi.org/10.1080/014461997372890

Hewitt, R.A. (1985) The procurement of buildings: proposals to improve the per-formance of industry. Report to the College of Estate Management, UK.

Hibberd, P.R. and Djebarni, R. (1996) Criteria of choice for procurement system. In: Pro-ceedings: COBRA '96, 19–20 September, University of the West of England, Royal In-stitution of Chartered Surveyors.

Kolmogoroff, A. (1956) Foundation of the Theory of Probability. Chelsea, New York.

Lorterapong, P. and Moselhi, A. (1996) Pro-ject network analysis using fuzzy sets the-ory, Journal of Construction Engineering and Management, ASCE, 122 (4), 308–320. http://dx.doi.org/10.1061/(ASCE)0733-9364(1996)122:4(308)

Masterman, J.W.E. (1992) An Introduction to Building Procurement Systems. E and FN Spon, London.

Masterman, J.W.E. and Duff, A.R. (1994) The selection of building procurement systems by client organizations. In: Skitmore, R.M. and Betts, M. (eds) Proceedings: 10th An-nual ARCOM Conference, Vol. 2. Loughbor-ough University of Technology, Association of Researchers in Construction Manage-ment, Leicestershire, 14–16 September, 650–659.

Masterman, J.W.E. and Gameson, R. (1994) Client characteristics and needs in relation to their selection of procurement systems. In: Rowlinson, S. (ed.) Proceedings: East Meets West" Procurement Systems Sympo-sium, CIB Publication 175, 4–7 December, Hong Kong, 79–87."

Nahapiet, H. and Nahapiet, J. (1985) The Management of Construction Projects, Case Studies from the UK and USA. Chartered Institute of Building, Ascot.

NEDO (1985) Thinking About Building, Na-tional Economic Development Office. HMSO, London.

Nguyen, V.U. (1985) Tender Evaluation by Fuzzy Sets. Journal of Construction Engi-neering and Management, ASCE, 111 (3), 231–243. http://dx.doi.org/10.1061/(ASCE)0733-9364(1985)111:3(231)

Rowlinson, S. and McDermott, P. (1999) Procurement systems: A guide to best prac-tice in construction. E and FN Spon, London.

Russell, J.S. (1992) Decision models for analysis and evaluation of construction con-tractors. Construction Management and Economics, 10 (3), 185–202. http://dx.doi.org/10.1080/01446199200000018

Russell, J.S. and Jaselskis, E.J. (1993) Pre-dicting construction contractor failure prior to contract award. Journal of Construction Engineering and Management, ASCE, 118 (3), 612–624. http://dx.doi.org/10.1061/(ASCE)0733-9364(1992)118:3(612)

Sharif, A. and Morledge, R. (1994) A func-tional approach to modelling procurement systems internationally and the identifica-tion of necessary support frameworks. In: Rowlinson, S. (ed) Proceedings: East Meets West" Procurement Systems Symposium, CIB Publication 175, 4–7 December, Hong Kong, 79–87."

Skitmore, M. and Marsden, D.E. (1988) Which procurement system? Towards a uni-versal procurement selection technique. Construction Management and Economics, 6 (1), 71–89. http://dx.doi.org/10.1080/01446198800000008

Singh, S. (1990) Selection of appropriate project delivery system for building con-struction projects In: Proceedings: CIB-90 Building Economics and Construction Man-agement, University of Technology Sydney, 469–480.

Turner, A. (1990) Building Procurement. Macmillan, London.

Zadeh, L.A. (1965) Fuzzy sets. Information and Control, 8, 338–353. http://dx.doi.org/10.1016/S0019-9958(65)90241-X

Zimmermann, H. J. (1991) Fuzzy Set Theory and Its Applications, 2nd edition. Kluwer Academic Publishers, USA. http://dx.doi.org/10.1007/978-94-015-7949-0

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM