Design and Build: Views from some Major Public Clients in Hong Kong

Albert P C Chan, Denny K C Ho, C M Tam


This paper presents the views of clients in public sector on design and build(D&B) procurement method. Specifically, their reasons of adopting D&B and refusing to adopt it were explored. Data were collected through face-to-face interviews with ten senior staff from four major public organisations in Hong Kong. The findings indicate that public clients held different views on D&B methods based on different grounds. Apart from functional requirements such as project completion time, cost certainty, etc., internal resources and political force would also influence client's adoption of D&B method in the public sector.

Full Text:



Akintoye, A. (1994) Design and build: a survey of construction contractors' views, Construction Management and Economics, 12, 155-163.

Akintoye, A. and Fitzgerald, E. (1995) Design and build: a survey of architects' views, Engineering, Construction and Architectural Management, 2(1), 27-44.

Bennett, J., Pothecary, E. and Robinson, G. (1996) Designing and building a world-class industry. Centre for Strategic Studies in Construction, University of Reading, Reading, U.K.

Chan, A. P. C. (1994) Evaluation of novation contract, National construction and Management Conference, 17-18 February, 1994, Sydney, Australia, 383-396.

Chan, A. P. C. (1995) Towards an expert system on project procurement, Journal of Construction Procurement, 1(2), 111-123.

Chan, A. P. C., Yu, A. T. W. and Tam, C. M. (1999) Enhanced design build â 12:43 PM 9/9/2014 procure a hospital project, CIB W92 and CIB TG23 Profitable Partnering in Construction Procurement, Procurement Systems and Culture in Construction Joint Symposium, 25-28 January, 1998, Chiang Mai, 405-415.

Kwong, H. S. (1996) The strategic role of design and build in the procurement process, Keynote Address at Design and Build Symposium, 30 May, 1996, Hong Kong, 1-4.

Love, P. E. D., Skitmore, M. and Earl, G. (1998) Selecting a suitable procurement method for a building project, Construction Management and Economics, 16, 221-233.

Mo, J. K. W. and Ng, L. Y. (1997) Design and build procurement method in Hong Kong â An overview, CIB W92 Procurement â A Key to Innovation, Procurement Systems Symposium, 20-23 May, 1997, Montreal, 453-462.

Ndekugri, I. and Turner, A. (1994) Building procurement by design and build approach, Journal of Construction Engineering and Management, 120(2), 243-256.

Ng, L. Y. and Mo, J. K. W. (1997) Hospital procurement by design and build: a case study in Hong Kong, CIB W92 Procurement â A Key to Innovation, Procurement Systems Symposium, 20-23 May, 1997, Montreal, 545-553.

Sanvido, V. E. and Konchar, M. D. (1998) Project delivery systems: CM at risk, design-build, design-bid-build. Research Report 133-11, Construction Industry Institute, University of Texas, Austin.

Skitmore, R. M. and Marsden, D. E. (1988) Which procurement system? Towards a universal procurement selection technique, Construction Management and Economics, 6, 71-89.

Songer, A. D., Molenaar, K. R. and Robinson, G. D. (1996) Selection factors and success criteria for design-build in theU.S. and U.K., Journal of Construction Procurement, 2(2), 69-82.

Walker, A. and Flanagan, R. (1991) Property and construction in Asia Pacific: Hong Kong, Japan and Singapore. BSP Professional Book, Oxford.

Works Branch (1992) Practice Note on Design and Build Contracts, Works Branch Technical Circular No. 17/92A, Hong Kong Government.