Explaining the Increase in the Australian Average House Completion Time:Activity-based versus Workflow-based Approach

Ehsan Gharaie, Ron Wakefield, Nick Blismas


Abstract

The Australian house building industry has been facing an increase in the average house completion time in the last decade. This increase in some states is quite dramatic. For instance, Western Australia has faced a 70 percent increase in the average house completion time during this period. This paper uses two planning approaches to explain this; i) the activity-based planning methods and ii) the workflow-based planning methods. In addition, this research investigates the strengths and weaknesses of these two planning approaches in explaining the behaviour of the house building industry. For this purpose, a national case study and five state case studies including Victoria, Western Australia, New South Wales, Queensland and South Australia have been used. The data related to the key parameters have been collected and their correlation with the average house completion time has been investigated. These key parameters include the average house floor area, the number of house completions and the number of houses under construction. The reasons for the increasing trend of the average house completion time have been postulated in all case studies. According to this research, the increase in the average house completion time cannot be explained using activity-based planning methods. In contrast, by using workflow-based planning methods, it has been shown that the average house completion time is correlated with the number of houses under construction. This paper shows that the average completion time is influenced directly by the workflow in the house building industry and that workflow planning should be the basis for the house building industry planning.

Keywords

average house completion time; Australian house building industry; activity-based planning; work-flow-based planning

Full Text

PDF

References

Australian Bureau of Statistics (2008) Feature article: average quarterly completion times for new houses. 8731.0 -Building Approvals, Australia, Jul 2008

Australian Bureau of Statistics (2009) 8752.0 -Building Activity, Australia, Dec 2009

Australian Bureau of Statistics (2010) Feature article: average floor area of new residential dwellings. 8731.0 -Building Approvals, Australia, Feb 2010

Bashford, H. H., Walsh, K. D. & Sawhney, A. (2005) Production System Loading-Cycle Time Relationship in Residential Construction. Journal of Construction Engineering and Management, 131, 15-22, http://dx.doi.org/10.1061/(ASCE)0733-9364(2005)131:1(15)

Dipasquale, D. (1999) Why don't we know more about housing supply? Journal of Real Estate Finance and Economics, 18, 9-23

Glaeser, E. L. (2004) NBER Reporter Spring 2004: Housing Supply, The National Bureau of Economic Research

Harris, R. B. & Ioannou, P. G. (1998) Scheduling Projects with Repeating Activities, Journal of Construction Engineering and Management, 124, 269-278

Hogg, R. V. & Craig, A. T. (1995) Introduction to mathematical statistics, Englewood Cliffs, NJ, USA, Prentice-Hall, Inc

Hopp, W. J. & Spearman, M. L. (2008) Factory Physics, McGraw Hill Higher Education

Koskela, L. (1992) Application of the New Production Philosophy of Construction. CIFE

Koskela, L. (1999) Management of Production in Construction: A Theoretical View, 7th Annual Conf. of Int. Group for Lean Construction. Univ. of California, Berkley, Calif., International Group for Lean Construction

Kottegoda, N. T. & Rosso, R. 2008. Applied statistics for civil and environmental engineers, Oxford, UK, Wiley-Blackwell.

Murphy, A. D. (2008) The microfoundation of housing market dynamics, Department of Economics. Duke University

National Housing Supply Council (2010) 2nd State of Supply Report, State of Supply Report, National Housing Supply Council

O'Brien, M., Wakefield, R. & Beliveau, Y. (2000) Industrializing the Residential Construction Site, Washington, DC, U.S. Department of Housing and Urban Development, Office of Policy Development and Research

Reda, R. M. (1990) RPM: Repetitive Project Modeling, Journal of Construction Engineering and Management, 116, 316-330

Sacks, R. & Partouche, R. (2009) Production Flow in the Construction of Tall Buildings. IN Samuel, T. A. & Eddy, M. R. (Eds.) Construction Research Congress. Seattle, Washington, ASCE

Sawhney, A., Walsh, K. D., Bashford, H. H. & Palaniappan, S. (2009) Impact of Inspected Buffers on Production Parameters of Construction Processes, Journal of Construction Engineering and Management, 135, 319-329

Willenbrock, J. H. (1998) Residential building design and construction, Upper Saddle River, N.J., Prentice-Hall

Yin, R. K. (1994) Case Study Research; Design and Methods, Sage publications

Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM